Similar Projects
Elliot and Cooper Intersection - ST1380 - City of Gilbert
Alteration
Conception
$7,338,000 est. value
Gilbert, AZ 85233

McDowell Rd: Citrus to Loop 303 - ST006
Alteration
Conception
$5,087,000 est. value
Goodyear, AZ 85338

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Banner Gilbert Medical Center Parking Lots
Design
Gilbert, AZ 85234

Environmental Project Specialist
Term Contract
Bidding
Phoenix, AZ

2050 Transportation Master Plan
Alteration
Bidding
Mesa, AZ

Shade and Streetscape Master Plan
Post-Bid
Gilbert, AZ 85296

Engineering, Planning and Development
Post-Bid

Pinnacle Peak Road 45th Avenue to 35th Avenue Paving and Storm Drain Improvements
Results
$9,000,722 est. value
Glendale, AZ 85310

Phoenix-Casa Grande Highway (I-10) 1-17 (Split) to SR 202L (Santan)
Results
Chandler, AZ 85225

Jackrabbit Crossing - West Indian School Road Eastbound Half Street Improvements, West Of North Jackrabbit Trail
Infrastructure
Construction
$1,275,000 est. value
Phoenix, AZ 85042

Eastern Canal Shared-Use Path Broadway to Baseline - CP0730 - City of Mesa
Infrastructure
Conception
$4,515,000 est. value
Mesa, AZ

Buckeye Pool & Parking Expansion
New Construction - 19,000 SF
Design
$1,450,000 est. value
Buckeye, AZ 85326

Engineering - SR 30 (Tres Rios)
Infrastructure
Bidding
$400,000 est. value
Goodyear, AZ

Research on the Impact of Diamond Grind Pavement Resurfacing on PM-10 Emissions
Term Contract
Post-Bid
AZ

Reported 06/23/2022 03:42 PM
Project Title

University Drive Utility Line; Alma School to Country Club - CP0220 - City of Mesa

Physical Address View project details and contacts
City, State (County) Mesa, AZ 85205   (Maricopa County)
Category(s) Heavy and Highway, Professional Services, Sewer and Water
Sub-Category(s) Engineering, Fuel/Chemical Tanks and Lines, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2025
Bids Due View project details and contacts
Estimated Value Less than $884,554
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct system improvements along University Drive to ensure operational reliability of the natural gas system. As of June 22, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents