Similar Projects
Abbott Court Mixed Use
New Construction
Conception
Derry, NH 03038

Market & Main Bedford
New Construction - 356,050 SF
Design
$70,000,000 est. value
Bedford, NH 03110

Pope Memorial SPCA of Concord
New Construction - 2,515 SF
Design
Concord, NH 03301

Highway Garage Building
New Construction - 5,808 SF
Bidding
Pittsburg, NH 03592

Hanover Street Garage Restoration
Renovation
Bidding
Portsmouth, NH 03801

Two Gas Utility Carts
Post-Bid
Portsmouth, NH

Request for Qualifications – Build Out and Restoration of 3000 Sq. Ft. Building
Renovation, Build-Out - 3,000 SF
Post-Bid
Keene, NH

Storrs Street Parking Garage Repairs
Results
Concord, NH 03301

MHT Parking Garage Repairs
Renovation
Results
$500,000 to $725,000 est. value
Manchester, NH

Concord Hospital Medical Office Building
New Construction, Addition - 140,000 SF
Construction
$50,000,000 est. value
Concord, NH 03301

195 Mechanic Street - Mixed Use Development
New Construction, Demolition - 44,025 SF
Construction
$8,000,000 est. value
Lebanon, NH 03766

Pleasant Street Micro Apartments
New Construction - 23,600 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Portsmouth, NH 03801

North Main Street Residential
New Construction
Design
Rochester, NH 03867

Rines Center Parking Garage 2022 Repairs
Renovation
Bidding
Manchester, NH 03101

Construct Heated Parking Lot
New Construction
Post-Bid
$1,000,000 to $5,000,000 est. value
Portsmouth, NH 03801

Last Updated 03/01/2022 02:39 PM
Project Title

Norris Cotton Upper Parking Deck Coating Replacement

Physical Address View project details and contacts
City, State (County) Manchester, NH   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Parking Garage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 to $400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A project has been developed to replace the outside parking deck coating system at the Norris Cotton Federal Building (NCFB). The work involves stripping the multi-layered polyurethane based coating system down to the concrete substrate in preparation for a new minimum three part UV resistant traffic rated polyurethane coating system. There are a number of expansion joints that are to be prepped and reworked. There are several linear feet of vertical to horizontal joints to be prepped and reworked. The expansion joints and other caulked joints are to be compatible with the polyurethane coating system selected. Parking lines are to be restored to the same pattern as currently present. As an option several hundred linear feet of polyurethane caulking on the remainder of the NCFB site are to be priced for joint repair / replacement subject to the availability of funds. The polyurethane caulking is to be within the same UV resistant exterior rated system as will be used on the parking deck repair.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Common Work Results for Masonry, Masonry Accessories, Masonry Control and Expansion Joints, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents