Similar Projects
Replace Existing Wastewater Lift Station 3
Renovation
Design
$200,000 est. value
Lacey, WA 98503

RFQ Engineering - Engineering Design and Other Services for Old Highway 99 / 79th Avenue Roundabout
Infrastructure
Bidding
$1,660,000 CJ est. value
Tumwater, WA 98501

RFQ - Update of Puget Sound Salmon Recovery Plan Local Watershed Chapters
Term Contract
Bidding
Olympia, WA 98501

Water System Zone Intertie Design Preparation
Infrastructure
Post-Bid

Water System Zone Intertie Design Preparation
Infrastructure
Post-Bid

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

Electrical Engineering Services
Infrastructure
Post-Bid

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

On-Call Consulting Services
New Construction, Infrastructure
Post-Bid
Olympia, WA

Conduct Bridge Load Ratings
New Construction, Infrastructure
Results
Olympia, WA

Rfq Multiple Engineering Service
Term Contract
Post-Bid

Engineering Consulting Services for Design and Construction of the Boulevard Road Reservoir Rehabilitation
Infrastructure
Results
Olympia, WA

Last Updated 08/10/2022 03:03 AM
Project Title

RFQ Design - Fire and Domestic Water Pump Renovation Design

Physical Address View project details and contacts
City, State (County) Olympia, WA 98505   (Thurston County)
Category(s) Professional Services, Sewer and Water
Sub-Category(s) Architectural, Engineering, Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,375,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Perform professional Architectural/Engineering consulting services for Fire & Domestic Water Pump Renovation. Project Design during the current (21-23) biennium. Bidding, Construction Administration and Closeout during 23-25 biennium. This project will be for the renovation of select Fire and Domestic water pumping equipment, valves, switch gear and controls in the existing Campus pumphouse building. In addition, this contract will include scope for building and system modifications to accept an Owner provided temporary rental power generator and demolition and replacement of the existing emergency power generator. Direct questions to Dave Shellman, TESC Project Manager, at shellmad@evergreen.edu. Consultants will be considered for selection based upon the following criteria categories: (1) Relevant Experience of Personnel to be used on the project (100%), (2) Qualifications of the Personnel to be used on the project (100%), (3) Proven successful experience working with college or university project teams in the design of similar projects (100%), (4) Previous Performance of the firm (100%). The Evergreen State College has established voluntary MWBE Goals of 10% MBE and 8% WBE. The method of contractor selection has not been determined at this time.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents