Similar Projects
Infrastructure Improvements Projects-Construction Qualifications
Term Contract
Bidding
Southfield, MI

Catch Basin Cleanout
Post-Bid
Reed City, MI 49677

Drop Shaft and Connecting Sewer Rehab-ST-S-4, ST-S-5 and UT-S-1
Post-Bid
Clinton Township, MI

Bedford SRF Manholes and Sewer Improvements
Results
Less than $1,750,000 est. value
Monroe, MI

Street and Utility Improvements - Washington Street and Dye Street
Results
Less than $1,362,523 est. value
Ionia, MI

Sanitary Sewer Rehabilitation Project
Construction
Less than $200,000 est. value
South Rockwood, MI

Grinder Pump Installs and Sanitary Sewer Repairs
Term Contract
Post-Bid
Brighton, MI 48114

Sanitary Sewer Repairs
Results
Less than $60,000 est. value
Wyandotte, MI

Two (2) Years – Hydrant, Grate and Manhole Cover Parts
Term Contract
Post-Bid
Flint, MI

Catch Basin Clean Out
Results
Hillsdale, MI

Trough Drain Maintenance
Post-Bid
Sandusky, MI

Royal Oak Township Sanitary Sewer Rehabilitation
Results
Less than $378,574 est. value
Royal Oak, MI

Big Creek Drain Maintenance
Post-Bid
Sandusky, MI

2019-2022 Sewer Cleaning and Video Inspection Service
Results
Port Huron, MI

Cargill and BRS Drain Maintenance
Post-Bid
Sandusky, MI

Last Updated 05/06/2020 05:57 PM
Project Title

M-139 Sanitary Sewer Extension Project

Physical Address View project details and contacts
City, State (County) Berrien Springs, MI   (Berrien County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work for which bids are being requested consists of the following: Extend sewer service along Edgewood Court and M-139 north of the US-31 interchange. Includes one lift station with generator, approximately 3,600 feet of 8” Sanitary Sewer along Edgewood Court and extending along M-139 north of Edgewood Court, 180’ of Jack and Bore installation to cross M-139, 2,000 feet of 6” forcemain to be installed via open cut, and 3,000 feet of 6” forcemain to be installed via directional drill along M-139 from Lemon Creek Road past Edgewood Court. The forcemain will be tapped into an existing 8” forcemain in M-139 near Lemon Creek Road. Related service leads, pavement restoration and vegetation restoration will also be completed.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents