Similar Projects
Summit County Fairgrounds - Phase IA
Renovation, Infrastructure
Conception
$500,000 CJ est. value
Coalville, UT 84017

Olympic View Development
New Construction, Infrastructure - 1,600,000 SF
Conception
$854,000,000 CJ est. value
Park City, UT 84060

Quinns Water Treatment Plant and Signal Hill Area
New Construction, Infrastructure
Design
Park City, UT 84060

Yarrow Park City Mixed-Use
Demolition, New Construction, Infrastructure - 5,000 SF
Design
$116,000,000 CJ est. value
Park City, UT 84060

SR-248 Corridor Improvements
Infrastructure
Bidding
$1,873,000 CJ est. value
Park City, UT 84060

SR-248 Corridor Improvements
Infrastructure
Bidding
$1,873,000 CJ est. value
Park City, UT 84060

Mountain Life Church Expansion
New Construction, Addition - 45,956 SF
Post-Bid
Park City, UT 84098

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Franklin Spring Rehabilitation Project
Infrastructure
Results
$157,000 est. value
Henefer, UT

Rossi Hill Reconstruction Project
Infrastructure
Results
Park City, UT

Harmons at the Junction
Demolition, New Construction, Infrastructure - 76,000 SF
Pending Verification
$20,000,000 CJ est. value
Park City, UT 84098

Harmons at the Junction
Demolition, New Construction, Infrastructure - 76,000 SF
Pending Verification
$20,000,000 CJ est. value
Park City, UT 84098

RFP - Highway 40 Corridor Spatial Study
Term Contract
Conception
Coalville, UT 84017

2023 Meter Project
Infrastructure
Bidding
$300,000 CJ est. value
Coalville, UT 84017

Heritage Park Utility Pipelines
Infrastructure
Post-Bid

Last Updated 05/12/2023 12:33 AM
Project Title

Slurry Seals Type II, Sealcoat Bike Paths, Rotomilling, Street Overlays, Utility Adjustments, and Crack Seals

Physical Address View project details and contacts
City, State (County) Park City, UT 84060   (Summit County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,507,709 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Tentative Start dates: Slurry: July 18th Sealcoat: July 18th Roto-milling/ overlays: July 5th Utility adjustments: June 27th and then readjust after overlays Crack Seal: Sept 5th Project includes four (4) bid schedules. The bidder may bid on one (1) or more of these schedules. Each schedule is to be bid as a complete project within the specifications attached herein. Project completion deadline for each bid schedule will vary as listed in Section 7 of the Construction Agreement. Schedule Description A Slurry Seals Type II approximately 82,811 sq. yd. B Sealcoat Bike Paths approximately 15,778 sq. yd. C Street Overlays approximately 5,259 tons Rotomilling 378,463 sq. ft Utility Adjustments Water valves/survey markers 113 ea. Manholes 78 ea. D Crack Seal 33 tons Owner S Opinion of Probable Construction Cost: 2022 - $1,041,095.52 Project Manager/Contact: Troy Dayley Public Works Director P.O. Box 1480 1053 Iron Horse Drive Park City, UT 84060 (435) 615-4909 fax troy@parkcity.org All questions must be submitted in writing via email by 10:00 a.m., Friday, April 15, 2022, to: Troy Dayley via email to: troy@parkcity.org. A bid bond in the amount of five percent (5%) of the total bid is required at the time of bidding. Payment and Performance bonds in the amount of one hundred percent (100%) of the total bid will be required. Park City Municipal Corporation reserves the right to reject any and all proposals for any reason. Bids will remain valid for ninety (90) days after bid opening, but cannot be withdrawn for forty five (45) days. All submittals shall be public records in accordance with government records regulations ( GRAMA ) unless otherwise designated by the applicant pursuant to UCA 63G-2-309, as amended. Award of contract is subject to approval by City Council, which is anticipated to be prior to May 30, 2022. Proposals lacking required information will not be considered. Park City Municipal Corporation reserves the right to change any dates or deadlines related to the bid submittal process. Successful bidder will be required to enter into Park City's standard Construction Agreement in a form approved by the City Attorney. Question Submission Close Date 5/5/2023 10:00 AM MDT

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents