Similar Projects
Newman Road Culvert Replacement
Bidding
Less than $150,000 est. value
Pennsburg, PA 18073

Simmons Elementary School Pool Filtration, Chlorination, and Drainage Upgrades
Post-Bid
Horsham, PA 19044

Meadow Brook - Flood Control
Results
Less than $6,210,000 est. value
Meadowbrook, PA

Schultz Road Culvert Replacement
Results
$90,000 est. value
Tylersport, PA 18971

Balligomingo and Brandywine Creek Road Slide Restoration
Results
$5,000,000 to $7,499,999 est. value
PA

Wissahickon Creek Stabilization and Enhancement
Results
$250,000 est. value
Blue Bell, PA 19422

Area B Streambank Stabilization
Results
Less than $75,000 est. value
PA

Summit Drive Culvert Replacement
Results
Upper Providence, PA

Fennel Road Culvert Project
Results
Less than $150,000 est. value
PA

Rowland Community Center Wall
Results
Cheltenham, PA 19012

Defford/Clyston Roads Retrofit Basin
Results
$40,000 est. value
Worcester, PA 19490

Knox Basin Improvements
Results
$190,000 to $195,000 est. value
Ardmore, PA 19003

Sinkhole Repairs
Results

2019-2021 UMT Emergency Sinkhole Repair Contract
Results
King of Prussia, PA

Spring House Roadway Improvements Project Phase 1 - Sumneytown Pike Culvert Extension
Results
$700,000 to $800,000 est. value
Spring House, PA 19477

Last Updated 08/16/2019 07:33 AM
Project Title

Growing Greener 2016 Project - Stormwater Management BMP Control Measures Roychester Park - Evergreen Manor Park

Physical Address View project details and contacts
City, State (County) Abington, PA 19001   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $180,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Consists of construction of BMPs at Roychester Park and Evergreen Manor Park. The construction of BMPs at Roychester Park includes a rain garden, riparian buffer restoration/plantings, a bioretention/infiltration trench, new infiltration berms and retentive grading. The construction of BMPs at Evergreen Manor Park include a infiltration basin, cross vanes and all related accessories.
Details
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Selective Clearing, Grading, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents