Similar Projects
The Optimist Apartments
New Construction, Renovation
Conception
Saint Louis, MO 63108

City Hall Window Replacement - 249000 - City of St. Joseph
Renovation
Conception
$900,000 est. value
Saint Joseph, MO 64501

Y--Jeff 199879 - Old Courthouse Phase 2 Renovations
Renovation
Design
$10,000,000 est. value
Saint Louis, MO 63102

Origin Hotel
New Construction
Design
Kansas City, MO 64120

McDonald County Courthouse Renovation
Renovation
Bidding
$200,000 est. value
Pineville, MO 64856

City Hall Garage extension
Renovation - 2,976 SF
Bidding
$200,000 est. value
Orrick, MO

Roof Repairs and Installations
Alteration
Post-Bid
Saint Louis, MO 63143

Professional Geotechnical Services
Term Contract
Post-Bid
Jennings, MO

Ozark R-VI School Store Infill
New Construction - 2,419 SF
Results
Ozark, MO

City Hall and Police Headquarters
New Construction, Renovation - 16,000 SF
Results
Platte City, MO 64079

Element By Westin
New Construction - 71,477 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Springfield, MO 65807

Cosmos Corporation Building
Addition - 150,822 SF
Pending Verification
O Fallon, Saint Peters, MO

Elevator Upgrades in the Historic Lawrence County Courthouse
Renovation
Bidding
$300,000 est. value
Mount Vernon, MO 65712

Fluoride System Upgrade
Renovation
Post-Bid
Festus, MO

Administration Building Remodel
Renovation
Results
Maryville, MO 64468

Reported 07/13/2022 11:34 AM
Project Title

City Hall Masonry Restoration - 249500 - City of St.Joseph

Physical Address View project details and contacts
City, State (County) Saint Joseph, MO 64501   (Buchanan County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2023
Bids Due View project details and contacts
Estimated Value $477,595
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a municipal facility in Saint Joseph, Missouri. Conceptual plans call for site work for a municipal facility. A detailed scope has not yet been determined. As of July 12, 2022, this project is currently in the FY 2022-2028 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Capitol/Court House/City Hall, New Construction.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents