Similar Projects
Residential Roof Repair for Ten (10) Houses
Post-Bid
Macon, GA

IDIQ Roofing
Post-Bid
$5,000,000 to $10,000,000 est. value
Hinesville, GA 31314

Roof Repair /Replacement
Results
$25,000 to $100,000 est. value
Hinesville, GA 31314

Roof and Window Replacement
Results
Less than $34,000 est. value
GA

Roof - Jenkins County Health Department
Post-Bid
Millen, GA

City Hall Roof/Building Repair
Results
Less than $11,300 est. value
Blue Ridge, GA

RCPS Central Office Complex Site and Roof
Post-Bid
Conyers, GA

Roofing Improvements
Results
GA

Paulson Athletic Building Roof Repairs
Post-Bid
Savannah, GA 31401

Savannah State University Herty Hall Roof Replacement
Results
Less than $235,000 est. value
Savannah, GA 31404

Roof Replacement for 2005 S. Main and 205 E. Jefferson
Post-Bid
Madison, GA

Roof Replacement at Friendship Road Elementary School
Results
Buford, GA 30519

Replace Roof at Macon Water Authority’s Support Services Building
Results
Macon, GA 31202

Depot Roof Reconstruction
Results
Pelham, GA

Cedartown High School Roof
Results
Cedartown, GA 30125

Last Updated 03/04/2020 04:26 PM
Project Title

Roof Repair Terrell Street

Physical Address View project details and contacts
City, State (County) Metter, GA 30439   (Candler County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of ail the existing roof panels to include the existing skylight panels (city will direct contractor where to put the old rood panels), replace all the roof panels with 12" PBR Panels that are 26 gauge and pricing to include furnishing all panels, screws, metal trim, boots, and wall flashing. Remove and replace all roof vents along the ridge of the roof. Rolled insulation to be used for roof panels to include all material and labor. Install 6" gutters to prevent water from splashing up onto the building. As an add alternate remove all the existing wall panels and replace them with 26 gauge PRB wall panels including all materials including Zac metal screws, trim around doors, completely enclose the walls of the existing building and labor

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents