Similar Projects
Rathbun Creek Trail Phase 3 - C.5 - City of Big Bear Lake
Infrastructure
Conception
$1,591,600 est. value
Big Bear Lake, CA 92314

Vineyard Avenue Pavement Rehabilitation: I-10 Freeway to Holt Boulevard - City of Ontario
Infrastructure
Conception
$445,000 CJ est. value
Rancho Cucamonga, CA 91730

North System North Trunk (NSNT) Sewer Siphon Replacement
Infrastructure
Design
$2,000,000 CJ est. value
Chino, CA 91710

Redlands Mall Development
New Construction, Renovation - 84,106 SF
Design
$275,000,000 est. value
Redlands, CA 92373

Starbucks / San Bernardino
New Construction, Infrastructure - 1,001 SF
Bidding
$750,000 CJ est. value
Highland, CA 92346

Construction of Simulation Center
New Construction, Infrastructure - 70,000 SF
Bidding
$100,000,000 CJ est. value
Fort Irwin, CA 92310

Street Striping and Pavement Marking Services
Infrastructure
Sub-Bidding
$300,000 CJ est. value
San Bernardino, CA 92401

PD Fence Installation On Seville Avenue Project
Infrastructure
Sub-Bidding
$320,000 CJ est. value
Fontana, CA 92335

O'Reilly Auto Parts #2 / Colton
New Construction, Infrastructure - 7,453 SF
Post-Bid
$2,000,000 CJ est. value
Colton, CA 92324

Storm Drain Improvements
Infrastructure
Post-Bid
Chino, CA 91709

Asbestos Abatement, Lead-Based Paint, Lead-Containing Paint, Lead-Containing Construction Materials and Mold Removal Inmate and Ward Labor Program
Alteration
Results
$3,000,000 est. value
Avenal, Blythe, Calipatria, Chino, Chowchilla, Coalinga, Corcoran, Corona, Crescent City, Delano, Folsom, Imperial, Ione, Jamestown, Lancaster, Norco, Sacramento, San Diego, San Quentin, Soledad, Stockton, Susanville, Tehachapi, Vacaville, Wasco, CA 93204

Pre Qualification of Contractors for Various Housing Programs
Renovation
Results
Fontana, CA 92335

San Bernardino County Transportation Tunnel
New Construction, Infrastructure
Pending Verification
$492,000,000 CJ est. value
Rancho Cucamonga, CA 91730

East Davidson Street Town Homes
New Construction, Infrastructure - 807 SF
Pending Verification
$5,000,000 CJ est. value
San Bernardino, CA 92408

Wineville Avenue Pavement Rehabilitation: Philadelphia Street to Francis Street - City of Ontario
Infrastructure
Conception
$320,000 CJ est. value
Ontario, CA 91764

Last Updated 08/10/2022 07:02 PM
Project Title

Hilltop House Demolition

Physical Address View project details and contacts
City, State (County) Apple Valley, CA 92307   (San Bernardino County)
Category(s) Heavy and Highway, Residential, Single Trades
Sub-Category(s) Environmental, Single-Family Homes, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $152,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

All requests for information (RFI) must be submitted in writing and received no later than July 20, 2022 at 2:00 PM. Questions can be sent by email to rberger@applevalley.org Engineer's Estimated Cost: $180,000 to $230,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Pre-Qualification for Bidders: Not Required License Type Required: A or C-21 Project Duration: 30 Work Days Liquidated Damages: $500.00 Per Work Day The Project generally consists of providing the necessary labor, equipment, and materials to completely demolish the Hill Top House structure, remove and haul away all debris, final grading, and all associated work in accordance with the project plans, standard specifications, special provisions, and as directed by the Director of Municipal Services. Work on the Project shall be completed within 30 working days based on the Caltrans 5 Day Working Day Calendar. The anticipated award date is August 9, 2022, and work must commence 10 days after the Notice of Award unless authorized by the Director of Municipal Services or his designee. The project is being paid for, in part, by funding from the Department of Housing and Urban Development (HUD). Award of a contract is dependent upon HUD approval. SECTION 3 STATEMENT: This is a HUD Section 3 construction contract. Contractors and subcontractors must address the Section 3 employment work hours benchmarks for Section 3 Workers and Targeted Section 3 Workers as established by the U.S. Department of Housing and Urban Development at 24 CFR Part 75. APPRENTICESHIP PROGRAM: Attention is directed to Sections 1777.5, 1777.6 and 1777.7 of the California Labor Code and Title 8, California Administrative code, Section 200 et seq. to ensure compliance and complete understanding of the law regarding apprentices. MINORITY AND WOMEN OWNED BUSINESS: Bidders will be required to document their status as a Minority Business Enterprise (MBE), a Women-owned Business Enterprise (WBE) or a non-MBE/WBE firm. Bidders that are not MBE/WBE firms will be required to make a good faith effort, and to document their efforts to include firms as part of the contract bid

Details

Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents