Similar Projects
Taft Avenue Waterline North Segment
Post-Bid
Berthoud, CO 80513

West I-25, 24-Inch Transmission Line Design
Post-Bid
Berthoud, CO 80513

Scrub Oak Circle Waterline Replacement
Results
Monument, CO 80132

Water Softening Project 24 Inch Transmission Line
Results
Commerce City, CO

New Fire Station Utility
Construction
Falcon, CO 80831

Wise Binney Connection Pipeline
Post-Bid
$19,000,000 est. value
Aurora, CO 80111

Iowa Place Water Line Remove and Replace
Results
Lakewood, CO

Ahec-20403-B: N. Chiller Plant Chilled Waterline Replacement
Post-Bid
Denver, CO

Baseline Waterline and North Tank Drainage Construction Project
Results
Brighton, CO

Mountain Sky Infrastructure Project
Post-Bid
Centennial, CO

Well No. 21 Transmission Pipeline
Results
Monument, CO 80132

Repair Utilities - Falcon Stadium
Post-Bid
$1,000,000 to $5,000,000 est. value
CO

San Juan Pipe Replacement
Results
Less than $100,000 est. value
Pagosa Springs, CO

WCR 54 & WCR 17 Waterline Replacement Project
Post-Bid
Berthoud, CO 80513

Ridgegate Dual Force Main
Results
Lone Tree, CO

Last Updated 05/03/2021 01:52 PM
Project Title

WCR 7 Water Transmission Pipeline Phase 3 Left Hand Water District 1

Physical Address View project details and contacts
City, State (County) Niwot, CO   (Boulder County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $2,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work to be performed under the provisions of these Bid Documents consists of the complete construction, including all Work appurtenant thereto, of the Weld County Road (WCR) 7 Water Transmission Pipeline Phase 3 project. This Work more specifically consists of the installation of approximately 6,730 lineal feet of 24-inch diameter steel treated water pipeline along WCR 7 between WCR 10 and the Arneson Tank site south of Erie Parkway/WCR 8. Pipeline installation work includes the trenchless installation of approximately 110 lineal feet of 36-inch diameter steel casing and 24-inch diameter carrier pipe across Erie Parkway. Pipeline installation work also includes approximately 425 lineal feet of 12-inch diameter C900 PVC treated water pipe. Pipeline appurtenances include isolation valves, fire hydrants, air and vacuum relief valve assemblies, blow off assemblies, and connections to existing distribution pipelines. Work will include all site preparation, erosion and sedimentation control, traffic control, pipeline construction, two (2) open-cut ditch crossings, installation of all associated appurtenances, site and road restoration, and dewatering as required. It is strongly recommended that the prospective bidders investigate the site of the Work sufficiently to satisfy themselves of the extent and conditions of the project.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents