Similar Projects
Street Reconstruction 2022 - Bellview DR and Bethany DR
Infrastructure
Bidding
Columbia, MO 65201

Marine Avenue Resurfacing And West Port Plaza Drive Intersection Improvement
Infrastructure
Bidding
Maryland Heights, MO 63043

Main Park and Heritage Park Sidewalk
Post-Bid
Washington, MO

Shelby County R-IV School District-Parking Lot Improvements
Post-Bid
$850,000 est. value
MO

Subdivision and Parking Lot Pavement Surface Preservation and Crack Seal
Results
$317,318 est. value
MO

2021 Curb, Gutter, Sidewalk and Trail Program- Phase 1
Results
Gladstone, MO

Olivette Apartments
New Construction, Alteration
Pending Verification
Olivette, MO 63132

Pedestrian Crossing Downtown
New Construction, Infrastructure
Pending Verification
$278,000 est. value
Columbia, MO

2022 Road and Parking Lot Pavement Program
Infrastructure
Bidding
Town and Country, MO

2022 and 2023 Citywide Sidewalk
Post-Bid
$969,502 est. value
Saint Louis, MO

Sidewalk Maintenance and Curb Ramp Construction
Term Contract
Results
$1,700,000 est. value
Springfield, MO

Pinkerton Properties Warehouse
New Construction, Alteration - 24,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
O'Fallon, MO 63366

Resurface and ADA Improvements from Route 366 (Watson Road) to Route 30 (Gravois Road)
Infrastructure
Bidding
$5,000,000 to $7,500,000 est. value
MO

Seal and Restripe the Asphalt Parking Lots
Infrastructure
Post-Bid
Lathrop, MO

Sidewalk Brick Band Replacement
Results
Kirksville, MO

Reported 03/21/2022 09:10 AM
Project Title

ADA Improvements

Physical Address View project details and contacts
City, State (County) MO   (Greene County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Job J7s3367d Route 160 Greene County. Ada Improvements on Route 160 From Chandler Avenue to Routes F and V and on Route V From North of College Street to Route 160 in Ash Grove, the Total Length of Improvement Being 0.313 Miles.(2): Job J8s3179 Route Norton Road Greene County. Ada Improvements on Norton Road Near Rte. 13 in Springfield and on Rte. Z at the Frisco Highline Trail North of Jackson Street in Willard, the Total Length of Improvement Being 0.337 Miles

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents