Similar Projects
Wayne Memorial High School Addition and Remodeling Project
Renovation, Addition
Post-Bid
Westland, MI

Gull Lake High School Auditorium Construction Project
Post-Bid
Richland, MI 49083

Phase 2 2019 School Bond Renovations
Renovation
Results
Sanford, MI 48657 

Oxford Community Schools 2017 Bond, Series 2
Build-Out
Results
Oxford, MI

Chelsea School District Building 500- Renovation Stem / Steam School
Construction
Chelsea, MI

Dutton Christian School - Addition
Addition - 9,000 SF
Construction
Caledonia, Gaines, MI 49316

Field House Locker Room Renovations
Post-Bid
Flint, MI

Oxford Community Schools Series 2 Bid Pack 4
Results
Oxford, MI

New 7/8 Middle School
New Construction
Construction
Grandville, MI 49418

Anderson Middle School Cafeteria Addition
Addition
Post-Bid
Berkley, MI 48072

Renovation of Existing Facilities, New Additions and Security Vestibules
Results
Kent City, MI

Centreville Maintenance Building
Construction
Centreville, MI 49032

Video Production Room Renovations
Post-Bid
Grand Blanc, MI 48439

Summer 2020 Renovation Projects
Renovation
Results
Ferndale, MI 48237

Brother Rice High School - Locker Room & Academics Renovations - Phase 1B
Renovation - 19,550 SF
Construction
Bloomfield Hills, MI 48301

Last Updated 03/06/2022 10:50 PM
Project Title

Middle/High School Wall Renovation and Partial ReRoof

Physical Address View project details and contacts
City, State (County) Ellsworth, MI   (Antrim County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Middle/Senior High School, Renovation.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents