Similar Projects
Camp Wihakowi Dam Removal
Demolition
Construction
Northfield, VT

Crystal Lake Dam Improvements
Results
Barton, VT

Fort Hill Bridge Removal, Stream Restoration and Route 15 Wildlife Passage Project
Construction
Less than $141,902 est. value
Williston, VT 05495

Miles Pond Dam Improvements
Results
$120,000 est. value
Concord, VT 05824

Last Updated 09/17/2020 11:03 AM
Project Title

Maintenance of Seepage Control System, Waterbury Dam

Physical Address View project details and contacts
City, State (County) Waterbury, VT   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $196,885
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Documenting, testing, and cleaning of dewatering wells; the replacement of dewatering well pumps and transducers, the cleaning and camera inspection of conduit filter drain outlet pipes; and the cleaning and camera inspection of toe drain; located at Waterbury Dam in Waterbury, Vermont.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents