Similar Projects
Biological Nutrient Removal (BNR) Project
Bidding
Cocoa, FL

Aboveground (Fuel) Storage Tank (AST) Purchase and Delivery
Alteration
Bidding
Tallahassee, FL

Replace Fuel Tanks Patrick AFB FL
Post-Bid
$10,000,000 to $25,000,000 est. value
Cocoa Beach, FL 32931

Pre-Qualification of Vendors for Maintenance and Repair of Fuel Systems Equipment
Term Contract
Post-Bid
Less than $150,000 est. value
Belle Glade, Pahokee, West Palm Beach, FL

Pinkney Fuel Site Replacement Construction Management at Risk Services
Results
Sarasota, FL

Replacement of the Fuel System
Results
Wewahitchka, FL 32465

Natural Gas Utility Distribution Line Installation Services
Alteration
Bidding
Leesburg, FL

Industrial Water Treatment Facility (IWTF) Tank Replacement
Post-Bid
Saint Petersburg, FL 33716

Fuel Tank and Cleaning Services
Term Contract
Results
Viera, FL 32940

Assetworks Fuel System (Fuelfocus), Inspection and Repair
Term Contract
Post-Bid
Less than $95,000 est. value
West Palm Beach, FL 33415

Purchase and Install 12,000 Gallon Jet a Fuel Tank and Related Work
Results
Less than $422,425 est. value
Live Oak, FL 32064

Northwest Water Reclamation Facility, Bleach Tank Replacement
Post-Bid
Saint Petersburg, FL 33710

Annual Inspection and Maintenance of Fuel Tanks
Term Contract
Results
Kissimmee, FL 34741

Diesel and Unleaded Fuel Polishing and Tank Cleaning
Post-Bid
Port Saint Lucie, FL

Annual Contract for Weekly/Monthly Rental of Diesel ByPass Pumps and Storage Tanks
Term Contract
Results
Pensacola, FL

Reported 05/20/2021 12:00 AM
Project Title

Department of Solid Waste Management's South Dade Landfill Gas System Expansion

Physical Address View project details and contacts
City, State (County) Homestead, FL 33032   (Miami-Dade County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $2,697,305
Plans Available from County Agency - 04/15/21
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all labor, materials, equipment, tools, transportation, services, incidentals, and performing all work necessary to complete the project, in place and ready for service in accordance with the plans and specifications prepared for Miami-Dade County Department of Solid Waste Management's Gas Collection and Control System Expansion South Dade Landfill. The project’s scope is specialized work that includes the construction of a landfill gas extraction system. Major tasks include mobilization and demobilization of equipment, labor, and construction of temporary facilities; installation of LFG components, which include but are not limited to gas extraction wells, header pipes, lateral pipes, control valves, and condensate drains; installation of a blower/flare station and demolition of existing LFG control facilities; Surveying/Record Documentation. The Work shall be performed in strict accordance with the applicable requirements of the federal, state and local agencies having jurisdiction, and environmental observations.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents