Similar Projects
Reported | 12/18/2020 12:00 AM |
Project Title | Construction of Devonwood Lower Dam |
Physical Address | View project details and contacts |
City, State (County) | Fayetteville, NC (Cumberland County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Description of the Work A. Rehabilitation of the Devonwood Lower Dam to repair damage caused by Hurricane Matthew. 1. Remove and Replace riser structure and low-level drain 2. Slip Line 36” Welded Steel Pipe 3. Install two 3’x7’ box culverts, filter diaphragm, chimney drain, and new spillway B. Re-route water utilities to abandon waterline crossing Devonwood Lower Dam 1. Install 8” HDPE by directional bore 2. Abandon old infrastructure and make necessary new connections |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |