Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 715/ 611 Intersection
Infrastructure
Design
$9,330,537 CJ est. value
Henryville, PA 18332

SR 715/ 611 Intersection
Infrastructure
Design
$9,330,537 CJ est. value
Henryville, PA 18332

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Miller Street Curb and Sidewalk Replacement
Alteration
Results
$100,000 est. value
Stroudsburg, PA

Water Material Supplies
Infrastructure
Results
East Stroudsburg, PA

Black Buffalo 3D Corporation
Demolition, New Construction, Infrastructure - 131,250 SF
Pending Verification
$35,700,000 CJ est. value
Smithfield Township, PA 18301

Margaritaville Resort Village Pocono Mountains
Demolition, New Construction, Infrastructure
Pending Verification
$1,300,000,000 CJ est. value
Pocono Manor, PA 18349

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

SR 715 over Pocono Creek
Demolition, New Construction, Infrastructure
Design
$3,855,006 CJ est. value
Henryville, PA 18332

Asphalt Paving Replacement
Infrastructure
Post-Bid
Pocono Pines, Pocono Summit, Swiftwater, Tannersville, PA 18350

Stemple Street Paving and ADA Ramp
Infrastructure
Results
$200,000 to $300,000 est. value
East Stroudsburg, PA

Pocono Summit Road Warehouse Development
New Construction, Infrastructure - 1,200,000 SF
Pending Verification
$130,000,000 CJ est. value
Mount Pocono, PA 18344

Last Updated 07/13/2023 08:39 AM
Project Title

209 - Schafer School House

Physical Address View project details and contacts
City, State (County) Stroudsburg, PA 18360   (Monroe County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $7,500,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project is for Safety Improvements and Intersection Modifications to Close Off Local Access to Sr 0209 at the Intersections of T-414 (Beaver Valley Road) and T-400 (Shafer School House Road). Work Includes Roadway Widening, Roadway Rehabilitation, Construction of a Cul-de-sac, Pavement Removal, Median Barrier Installation, Traffic Signal Removal, Drainage Upgrades, Stormwater Management, and Other Miscellaneous Construction as Indicated on the Approved Drawings Included in the Bid Package for State Route 0209, Section 17s, in Monroe County, Hamilton and Stroud Townships. Work at T-414 (Beaver Valley Road) is From Approximately Northbound Station 306+81.08 (Segment/offset 0310/2963) and Southbound Station 308+34.47 (Segment/offset 0311/3336) to Approximately Northbound Station 312+21.00 (Segment/offset 0320/0371) and Southbound Station 312+21.00 (Segment/offset 0321/0371). Work at T-400 (Shafers School House Road) is From Approximately Northbound Station 395+00.00 (Segment/offset 0340/2308) and Southbound Station 395+00.00 (Segment/offset 0341/2308) to Approximately Northbound Station 441+80.00 (Segment/offset 0360/1442) and Southbound Station 441+80.00 (Segment/offset 0361/1293). Work is Also Included on T-414 (Beaver Valley Road) and T-400 (Shafers School House Road). Project Cost Range: $5,000,000.00 - $7,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 12.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Miscellaneous Rehabilitation Work Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - 209 - Schafer School House *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents