Similar Projects
C1DA--VISN 21 Master Planning/Study A/E IDIQ
New Construction, Term Contract
Design
$50,000,000 to $100,000,000 est. value

C1DA--VISN 21 Master Planning/Study A/E IDIQ
New Construction, Term Contract
Design
$50,000,000 to $100,000,000 est. value

RFQ - Comprehensive Long-Term Environmental Action navy (C.L.E.A.N.) V Indefinite Delivery/Indefinite Quantity contract for Architect-Engineer (A-E) services
Term Contract
Bidding
$240,000,000 CJ est. value
San Diego, CA 92132

Engineering, Planning and Development
Post-Bid

Engineering, Planning and Development
Post-Bid

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

Indefinite Delivery/Indefinite Quantity Contract for Architect-Engineer Services for Geotechnical Engineering Services at Various Government Installations Primarily In The NAVFAC-South
Term Contract
Post-Bid
$2,000 to $15,000,000 est. value

Haystack Channel Improvements
Infrastructure
Results

A and E On-Call Structures Design and Project Development and Structure Construction Support Services
Infrastructure
Post-Bid
$4,000,000 to $6,500,000 est. value

Dam Safety Engineering Services-North
Alteration
Post-Bid
$30,000,000 to $40,000,000 est. value

Indefinite-Delivery Indefinite-Quantity Architect-Engineer Contract; Mechanical, Electrical, Plumbing And Fire Protection; Navfac Sw
Term Contract
Post-Bid
$5,000 to $40,000,000 est. value

A and E on-Call Roadway Construction Services
Infrastructure
Post-Bid
$12,472,052 to $20,267,085 est. value

Unrestricted Architect-Engineering Airfield Paving Design MATOC
Term Contract
Post-Bid
Less than $30,000,000 est. value

A-E IDIQ Surveying and Mapping
New Construction, Term Contract
Post-Bid
$10,000,000 est. value

Last Updated 08/22/2022 10:35 AM
Project Title

RFP - Amador Consolidated High School

Physical Address View project details and contacts
City, State (County) Sutter Creek, CA 95685   (Amador County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

A Facilities Utilization Master Plan is a document that serves as a reference upon which decisions are made for future facility needs. Facilities planning requires building and modernizing schools for a rapidly changing tomorrow. With this in mind, planners should consider educational needs projected into a future that will serve the needs of all students. The method of Contractor Selection has not been Determined at this time.

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents