Similar Projects
Ball Field Lighting Upgrade - F-000846 - City of Houston
Renovation
Conception
Less than $1,845,000 est. value
Houston, TX 77002

Lake Jackson Apartments Renovation
Renovation
Design
$8,000,000 est. value
Lake Jackson, TX 77566

Lake Jackson Apartments Renovation
Renovation
Design
$8,000,000 est. value
Lake Jackson, TX 77566

Grimes Park
New Construction
Post-Bid
$500,000 est. value
La Porte, TX

Acid Wash Swimming Pool
Results

Acid Wash Swimming Pool
Results

Avanti Silver Heights
New Construction - 4,729 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
San Antonio, TX 78213

Connally Loop Apartments
New Construction - 441,002 SF
Pending Verification
$10,000,000 CJ est. value
San Antonio, TX 78224

Hansen-Zak
New Construction
Design
$3,000,000 est. value
Bryan, TX 77801

Harmony School of Ingenuity - Soccer Field Project
New Construction
Results
$300,000 est. value
Houston, TX 77025

Hutto Station
New Construction - 5,500 SF
Design
$2,500,000 est. value
Hutto, TX 78634

Twinwood Parkway Phase 1B, Segment C-D
Results
McKinney, TX 75072

Fairway Drive Duplex
New Construction, Infrastructure
Design
$1,100,000 est. value
Bryan, TX 77801

Sienna Section 34 Park
Term Contract
Results
Katy, TX

Residences At Toler
New Construction
Design
$10,000,000 est. value
Longview, TX 75605

Reported 07/20/2022 08:22 AM
Project Title

Barkley Meadows

Physical Address View project details and contacts
City, State (County) El Campo, TX 77437   (Wharton County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Clubhouse/Social Club, Multi-Family Homes, Park/Playground, Swimming Pool(s)
Contracting Method Bids by Invitation.
Project Status Construction Documents, Construction Start Expected November 2022, Construction Completion Expected June 2024,
Bids Due View project details and contacts
Estimated Value $250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and new construction of a mixed-use development in El Campo, Texas. Working plans call for the construction of a 168,259-square-foot, two-story above grade, 170-unit multi-residential development; clubhouse / community center; swimming pool; and for site work for a playground / park / athletic field. As of July 19, 2022, construction documents are 95% complete and the plans have been submitted for permitting. General contractor information has been disclosed. Construction is expected to begin November 2022 and be completed June 2024.

Details

Multi-Family Homes, 2 Stories Above Grade, 168,259 SF New Construction, 170 Unit(s), Clubhouse/Social Club, New Construction, Park/Playground, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents