Similar Projects
Dunn Creek Greenway Phase 4 - Town of Wake Forest
Infrastructure
Design
$944,000 CJ est. value
Lumberton, NC 28360

Dunn Creek Greenway Phase 4 - Town of Wake Forest
Infrastructure
Design
$944,000 CJ est. value
Lumberton, NC 28360

Purnell Swett High School Multipurpose Classrooms
New Construction, Infrastructure
Bidding
$80,000 CJ est. value
Maxton, NC 28364

Utility Improvements SPHS Multipurpose Classrooms
Infrastructure
Bidding
$4,000,000 CJ est. value
Saint Pauls, NC 28384

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Royal Farms #475 / Lumberton
New Construction, Infrastructure - 5,191 SF
Post-Bid
$1,300,000 CJ est. value
Lumberton, NC 28358

Asphalt Surface Treatment
Infrastructure
Results
NC

Resurfacing, Milling and Pvt. Mkgs. - NC 41 and NC 71
Infrastructure
Results
NC

I-74/I-95 Industrial Park
Infrastructure
Construction
Lumberton, NC

Grading, Drainage, Paving, Retaining Walls, And Structures
Infrastructure
Construction
$282,928,483 CJ est. value
Lumberton, NC 28358

Career Tech Center - Public Schools of Robeson County
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Lumberton, NC 28358

Hurricane Florence Waste Water Treatment Plant Expansion - Town of Pembroke
Renovation, Infrastructure
Pending Verification
$7,200,000 CJ est. value
Pembroke, NC 28372

Hurricane Stormwater Repairs Project
Infrastructure
Post-Bid
Maxton, NC

Resurfacing, Widening, Milling, Shoulders and Pavement Markings
Infrastructure
Results
$2,937,953 est. value
NC

Grading, Drainage, Paving, Retaining Walls, and Structures
Infrastructure
Construction
$247,025,388 CJ est. value
Lumberton, NC 28358

Last Updated 07/22/2023 12:01 AM
Project Title

Grading, Paving, Wedging & Pavement Markings - NC 710

Physical Address View project details and contacts
City, State (County) Maxton, NC 28364   (Robeson County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $788,763 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

County: Robeson Contract : DF00433 TIP No.: W-5706Y Goal Type: DBE 2.4% WBS: 45943.3.2 Federal Aid: HSIP-0710(040) Route: NC 710 Location: Curve Northwest of SR 1345 (Island Grove Road) Bid Bond: 5% Bid Bond Or Bid Deposit Required A Bid Bond is required in accordance with Article 102-10 of the 2018 NCDOT Standard Specifications. Contract Payment and Performance Bonds are required in accordance with Article 103-7 of the 2018 NCDOT Standard Specifications. Should you have questions, or need additional information, please contact Neil Butler, Assistant Division Proposals Engineer at jnbutler@ncdot.gov or by phone at 910-364-0603. All Prospective Bidders Shall Be Prequalified With the Department of Transportation Prior to Submitting a Bid. Contractors Who Are Not Prequalified May Obtain Information and Forms for Prequalifying From the Prequalification Section of the Contract Standards and Development Unit The date of availability for this contract is August 21, 2023 The completion date for this project is January 24, 2025. NC DOT - Grading, Drainage, Paving & Signals - NC 87 44852.1.26 44852.3.26

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents