Similar Projects
Rehabilitation of Screened Final Effluent (SFE) Pump Station - 216008 - The Great Lakes Water Authority
Infrastructure, Alteration
Conception
Less than $35,607,000 est. value
Detroit, MI 48209

Grosse Ile Parkway Bridge / Trenton Channel, Phase 2 - 30-424 - Wayne County
Infrastructure, Renovation
Conception
$2,800,000 CJ est. value
Grosse Ile, MI 48138

Panda Express / Canton
New Construction, Infrastructure
Design
$700,000 CJ est. value
Canton, MI 48188

Sidewalk Replacement Program Phase 1
Infrastructure
Design
$200,000 CJ est. value
Inkster, MI 48141

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Sanitary Force Main Repair
Infrastructure
Bidding
$600,000 CJ est. value
Rockwood, MI 48173

Romulus Corporate Park Building 3
New Construction, Infrastructure - 243,770 SF
Sub-Bidding
$28,000,000 CJ est. value
Romulus, MI 48174

Greenhouse Installation at Garfield Community School Bid
Post-Bid
Livonia, MI 48150

Cold Water Single Register Mech Type 2 Inch Meters
Infrastructure
Post-Bid
Detroit, MI

2021 Water Main and Sewer Repair Contract
Results
Ecorse, MI

Copper For Lead Line Replacements
Results
Dearborn, MI

Remove and Replace Sidewalks
Infrastructure
Construction
$200,000 CJ est. value
Highland Park, MI 48203

Detroit Center for Innovation - University of Michigan
New Construction, Infrastructure - 190,000 SF
Pending Verification
$250,000,000 CJ est. value
Detroit, MI 48226

Chipotle / Canton
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Canton, MI 48188

Allen / CN RR Grade Separation - 30-217B - Wayne County
New Construction, Infrastructure
Conception
$27,000,000 CJ est. value
Woodhaven, MI 48183

Last Updated 12/07/2022 12:25 PM
Project Title

Oakwood District Intercommunity Relief Sewer Modification at Oakwood District - 222001 - Great Lakes Water Authority

Physical Address View project details and contacts
City, State (County) Detroit, MI 48226   (Wayne County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2025
Bids Due View project details and contacts
Estimated Value $47,392,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes basis of design (study) report on alternative solution to proposed Oakwood District Intercommunity Relief Sewer, diversion of storm water flow, and construction assistance during construction phase of emerging projects. Coordinate with DWSD projects including catch basin restrictions and green spaces. As of August 16, 2022, this project is currently in the FY 2023-2027 CIP. Funding for this project is allotted in the city's capital improvement plan for construction Fy 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents