Similar Projects
Milton STP BP16(10) (US Route. 7 Gap Project)
Results
$970,995 est. value
Essex Junction, VT

Vermont Route 7 Milton Streetscape Project - South
Results
$324,720 est. value
Milton, VT

Mt. Philo Summit Trail Reconstruction
Results
Charlotte, VT

CY-20 Sidewalk Program
Results
$900,000 to $1,200,000 est. value
Burlington, VT

Sidewalk Replacement Charlotte Central School and Shelburne Community School
Results
$97,700 est. value
Charlotte, Shelburne, VT 05445

Jericho STP BP15(10)
Results
$342,906 est. value
Jericho, VT 05465

2020 Sidewalk Spot Repairs
Results
Colchester, VT

TAP TA15(4) - Sidewalk
Results
Essex, VT

Trail Construction Adjacent to State Park Road
Results
Charlotte, VT

Cherry Street Sidewalk STP SDWK(18)
Results
Less than $300,000 est. value
Milton, VT

Burlington Greenway Construction Phase 3B North: Blanchard Beach to Proctor Place
Results
$100,000 to $300,000 est. value
Burlington, VT

CEATS Building 119 Parking Improvements
Results
Jericho, VT 05465

Colchester-Essex NH 030-1 (34)
Results
$1,000,000 to $2,500,000 est. value
Colchester, Essex, VT 05439

Underhill STP BP13(5) Park Street and VT Route 15 Sidewalk
Results
$250,000 to $500,000 est. value
Underhill, VT 05489

Blair Park Sidewalk Project - Williston STP BP17(12)
Results
Less than $250,000 est. value
Williston, VT

Last Updated 06/18/2020 02:37 PM
Project Title

Hinesburg Community School Parking and Sidewalk Improvements

Physical Address View project details and contacts
City, State (County) Hinesburg, VT 05461   (Chittenden County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves the reconstruction of the existing bus loop and parking area on the north and west sides of the Hinesburg Community School building, as well as the reconstruction of the existing curb and sidewalks on the north and west sides of the school building. The project also includes the installation of a new bituminous concrete pavement overlay for the drive area leading to the existing lower parking area located along Silver Street. The project includes, but is not limited to, the following: ±3,355 square yards of bituminous concrete pavement reconstruction ±475 square yards of monolithic cement concrete curb and sidewalk construction ±135 square yards of cement concrete sidewalk construction ±465 linear feet of cement concrete curb construction ±5,805 square yards of bituminous concrete pavement overlay

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents