Similar Projects
30th St And Kessler Blvd Area Drainage Improvements
Design
$3,600,000 est. value
Indianapolis, IN 46222

Lake George Canal Middle Section Restoration, Lake County, Indiana
Design
$10,000,000 to $25,000,000 est. value
IN

Lawrence Trades District Drainage Improvements
Bidding
$1,200,000 to $1,400,000 est. value
Indianapolis, IN

Bridge 99 Replacement
Infrastructure
Bidding
IN

48" Precast Reinforced Concrete Pipe
Post-Bid
Indianapolis, IN 46077

Culvert Pipe, Metal and Plastic
Post-Bid
Connersville, IN

Polymer Precoated Corrugated Steel Pipe and Couplings
Results
Indianapolis, IN 46077

River Ridge Gateway Lake Remediation
Results
Jeffersonville, IN 47130

Michigan City Harbor Break Water Repairs, Laporte County, Indiana, (USACE-Chicago District Project)
Design
$1,000,000 to $5,000,000 est. value
IN

Small Structure Pipe Lining
Infrastructure
Bidding
IN

Culvert Replacement
Post-Bid
Greenfield, IN

2020 Addison Street Drainage Improvements
Renovation
Results
Crown Point, IN 46307

Purchase of Drainage Tile
Term Contract
Post-Bid
New Castle, IN

Greenfield Avenue Culvert Over Lehr Ditch
Results
Noblesville, IN 46060

Regulated Drains Maintenance
Post-Bid
Evansville, IN

Reported 06/18/2021 12:00 AM
Project Title

Detention Pond Repair & Maintenance

Physical Address View project details and contacts
City, State (County) Portage, IN 46368   (Porter County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Repair and maintenance work to the detention pond located at the corner of McCool Road and County Road 750 N in Portage Township, Porter County, Indiana. The scope of work on the project would include: Project #1 (Streamway) 1. Remove and dispose of logs and miscellaneous debris from outlet of culvert entering from County Road 750 N 2. Clear and re-trench, as necessary, the stream going from culvert to fenced-in drain so as to ensure proper flow 3. Remove and dispose of any garbage and debris from streamway. The trees, field grass and cattails shall remain along both sides of streamway. However, any debris shall be removed and disposed of 4. Remove and dispose of any debris, weeds and tree saplings located in and around fenced in drain 5. Contractor is responsible for disposal and any fees pertaining to disposal of any waste materials 6. Contractor must provide before and after pictures. Project #2 (Tree Line) 1. Cut down and remove any dead trees and underbrush in tree line along County Road 750 N. from McCool Road to west property line 2. Remove and dispose of any garbage and debris in tree line along County Road 750 N, from McCool Road to west property line 3. Contractor is responsible for disposal and any fees pertaining to disposal of any waste materials 4. Contractor must provide before and after pictures

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents