Similar Projects
Castaway Cove Park Trail - City of Wichita Falls
Infrastructure
Conception
$400,000 CJ est. value
Wichita Falls, TX 76301

Castaway Cove Park Trail - City of Wichita Falls
Infrastructure
Conception
$400,000 CJ est. value
Wichita Falls, TX 76301

Toyota of Wichita Falls
New Construction, Infrastructure - 30,999 SF
Design
$9,000,000 CJ est. value
Wichita Falls, TX 76310

FM 1954 - Surfacing/Roadway Restoration
Infrastructure
Bidding
$7,363,920 CJ est. value
Wichita Falls, TX 76310

FM 1954 - Surfacing/Roadway Restoration
Infrastructure
Bidding
$7,363,920 CJ est. value
Wichita Falls, TX 76310

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Concrete and Asphalt Construction Services
Term Contract
Post-Bid
Burkburnett, TX

Wichita Falls Parking Lot Asphalt Overlay
Results
$148,977 est. value
Wichita Falls, TX 79306

Resurface Roadway
Results
$7,770,754 est. value
TX

QuikTrip #7907 / Wichita Falls
New Construction, Infrastructure
Construction
$850,000 CJ est. value
Wichita Falls, TX 76306

QuikTrip #7907 / Wichita Falls
New Construction, Infrastructure
Construction
$850,000 CJ est. value
Wichita Falls, TX 76306

Church of the Good Shepherd Parish Hall
Addition, Demolition, Infrastructure - 315 SF
Pending Verification
$300,000 CJ est. value
Wichita Falls, TX 76301

Water System Improvements / City of Wichita Falls
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Wichita Falls, TX 76301

Lake Wichita Land Acquisition Near Boat Ramp - City of Wichita Falls
Infrastructure
Conception
$2,070,000 CJ est. value
Wichita Falls, TX 76308

2022 Drainage Maintenance Repairs
Infrastructure
Bidding
$600,000 CJ est. value
Wichita Falls, TX 76301

Last Updated 08/29/2022 04:03 PM
Project Title

Circle Trail Completion With Spurs - City of Wichita Falls

Physical Address View project details and contacts
City, State (County) Wichita Falls, TX 76301   (Wichita County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $21,781,314 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Complete the estimated 25 mile Circle Trail by connecting the three gaps. Currently, approximately 23 miles are completed or nearing completion. The gaps are 1) between the Lucy Park and the Camp Fire Property, and 2) between Barnett Road and Lake Wichita Park. The latter trail may be partially constructed in Lake Wichita to increase trail interest/attractiveness and to avoid shoreline encroachments. Also, included are three Circle Trail spurs. These are 1) a two mile spur from the Holliday Creek trail along the BNSF RR ROW through downtown ending at the Wichita River trail @ $2m, 2) a five mile spur from the Wichita River trail by O'Reilly Park north along the BNSF RR ROW under Spur 325 and under I44 to trailhead at Missile Road @ $5m, and 3) a 1.5 mile spur, pending Corps of Engineers and MSU approval, from the Holliday Creek trail up the McGrath Creek concrete channel, under five street bridges, connecting with the MSU Sikes Lake trail, continuing through Wood Memorial Park and the Maplewood Drive median under two street bridge replacements, to end at Kemp Street @$6m. Total new trail length is approximately 8.5 miles, assuming approvals of the McGrath Creek spur. The project is included in the city's 2022-2026 Capital Improvement Program (CIP). As of August 29, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents