Similar Projects
Campus Redevelopment
New Construction, Renovation, Demolition
Conception
Mount Vernon, VA

Crystal Houses III
New Construction - 31,000 SF
Design
Arlington, VA 22202

The Waypoint at Fairlington
New Construction, Renovation
Design
Alexandria, VA 22302

Development of a Privately Funded Downtown Park
Post-Bid
$2,310,000 to $2,660,000 est. value
Harrisonburg, VA

Waterslide Repair Work
Results
Alexandria, VA

Construction of the Embrey Mill Athletic Fields - Phase 3 (Fields 9, 10 and 11)
Results
Stafford, VA 22554

Village Center At Columbia Pike
New Construction, Build-Out - 103,530 SF
Construction
$80,000,000 est. value
Arlington, VA

Services For Replacement of the Powhatan Springs Skatepark and Associated Amenities
Renovation - 19,000 SF
Construction
$2,000,000 est. value
Arlington, VA

Athletic Surfacing with Related Materials, Supplies, Installation, and Services
Results

Preston Lake Luxury Apartments
New Construction
Construction
Harrisonburg, VA

Renovation of the Mount Vernon Community School Playground
Results
Alexandria, VA

Dawson Creek Park Renovations
Construction
Arlington, VA

First Landing State Park Construct 64th Street Entrance Restroom
Results
Virginia Beach, VA

Green Hill Park Road Improvements
Results
Salem, VA

Gunston Park Diamond Field Replacement
Results
$1,803,000 est. value
Arlington, VA

Last Updated 10/23/2019 11:47 AM
Project Title

Inlet View Campground Improvements

Physical Address View project details and contacts
City, State (County) Chincoteague, VA   (Accomack County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Park/Playground, Restroom/Bath House
Contracting Method Bids by Invitation.
Project Status Feasibility Study, Site Analysis
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The plan includes bath houses,157 back-in RV sites, 40 deluxe back-in sites, a dock for recreational fishing and crabbing, pools and a walkway around the perimeter. Needed Water and Sewer Line improvements are being considered by the city.
Details Restroom/Bath House, New Construction, Dock/Pier/Marine, Park/Playground, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents