Similar Projects
Corrections North and South Perimeter Security Buildings
New Construction
Conception
Orlando, FL 32839

Okeechobee County Sheriffs Department Jail Renovation and Expansion Project
Renovation, Addition
Design
$20,000,000 to $30,000,000 est. value
FL

Design-Build Services For Replacement Jail Site 1 - Training & Treatment Center
Bidding
Miami, FL

Pasco County Jail Expansion
Post-Bid
New Port Richey, FL 34654

South County Jail Inmate Booths Renovations
Renovation
Post-Bid
Frostproof, FL 33843

Police Department Shower Rehabilitation
Results
Less than $105,000 est. value
Davie, FL 33314

Building Management Services at TGK
Term Contract
Results
Medley, Miami, FL 33166

Columbia County Detention Facility
Construction
Jacksonville, FL

Columbia County Detention Facility
Construction
Jacksonville, FL

DMS Gadsden Correctional Facility Dorm Renovations
Renovation
Post-Bid
Quincy, FL 32351

East Jail Control Rooms Renovation
Renovation
Results
Less than $100,000 est. value
Sarasota, FL 34237

Collier County Jail (J1) Kitchen Replacement and Safety Upgrades
Renovation
Results
Less than $1,800,000 est. value
Naples, FL 34112

Construction Management Services for Mental Health Renovations at Wakulla Annex & Santa Rosa Annex
New Construction, Renovation
Results
Less than $12,181,000 est. value
Crawfordville, FL 32327

Elevator Modernization at the Land O` Lakes Detention Center
Results
Land O' Lakes, FL 34637

John E. Polk Correctional Facility Kitchen Renovation Project
Renovation
Results
Less than $350,000 est. value
Sanford, FL 32773

Last Updated 01/28/2021 01:59 PM
Project Title

Juvenile Justice Detention Renovation Project

Physical Address View project details and contacts
City, State (County) Pensacola, FL 32501   (Escambia County)
Category(s) Government/Public
Sub-Category(s) Prison/Jail
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $175,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of modifications to the Juvenile Detention Center, located at 1800 St. Mary Ave, Pensacola, 32501. The renovations will include the Office 217/218, Laundry 133, Dining 127, and Telecommunications Room 157. Office 217/218: The wall between the two offices will be demolished along with the small break counter and toilet room in Office 217. All existing plumbing and electrical devices, piping, conduit, circuits, etc. serving the space shall be disconnected and removed. Existing HVAC ductwork and fire protection piping shall remain and be modified to suite the renovation. The enlarged space will be outfitted as a multi-occupant officer supporting four owner-furnished/owner-installed workstations. New power, lighting, fire alarm, telecommunications, HVAC diffusers, fire protection sprinklers, etc. will be provided to support the new space function. Laundry 123: A new owner furnished/contractor installed washing machine shall be installed adjacent to the existing. The existing commercial dryer shall be relocated from adjacent to the existing washing machine to the3 northeast corner of the room. A new panelboard will be installed to support the new washing machine. The existing dryer electrical circuit shall be extended to the new dryer location. A new trench drain shall be provided along with hose bibs to support the new washing machine. Dining Room 121: Two new branch circuits shall be provided to support a new owner furnished/contractor installed ice cream machine. Telecommunications Room 157: The existing analog CCTV headend equipment shall be replaced with hybrid IP/analog equipment. The existing CCTV cameras and monitoring stations are existing to remain and shall be reconnected to the new headend equipment. Replacement of the equipment shall be phased and coordinated with Juvenile Detention Center staff.

Details

Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Thermal Insulation.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Painting.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Storm Drainage, Facility Storm Drains, Facility Trench Drains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Lighting.
Division 27 - Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Conductors and Cables for Electronic Safety and Security, CCTV Communications Conductors and Cables.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents