Similar Projects
Groh Farm Residential Development Phase 1
New Construction, Infrastructure
Conception
Mankato, MN

At Home Apartments Phase 1
New Construction
Conception
Inver Grove Heights, MN

Bde Maka Ska Park Pavilion
New Construction
Design
Minneapolis, MN 55408

Highlands at Settlers Ridge Residential Development
New Construction, Infrastructure
Design
Inver Grove Heights, MN

Valley View Park Dugouts
New Construction
Bidding
Bloomington, MN 55420

Northeast Athletic Fields Park Tennis Court Surface Overlay
Infrastructure
Bidding
Minneapolis, MN 55413

Skatepark, Bike Park, Pump Track Solutions
Term Contract
Post-Bid
Less than $15,000,000 est. value

Skatepark, Bike Park, Pump Track Solutions
Term Contract
Post-Bid
Less than $15,000,000 est. value

Heritage Village Park Phase 3 Site Improvements
Results
Inver Grove Heights, MN 55076

Field Reconstruction ISD 11 High School Stadiums
Results
Anoka, MN 55303

Historic Forestville Interior Restoration
Renovation - 27,000 SF
Construction
Preston, MN 55965

Hillcrest Golf Course Redevelopment
New Construction
Pending Verification
Saint Paul, MN

Petsuites Of Woodbury
New Construction - 13,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Woodbury, MN

Alpine Park Off Leash Area Expansion
Post-Bid
Anoka, MN

New Splash Pad at Phelps Field Park
Results
Minneapolis, MN 55407

Last Updated 08/23/2021 04:08 PM
Project Title

2021 Sauk River Park Improvements

Physical Address View project details and contacts
City, State (County) Sartell, MN   (Stearns County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $207,841
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work include: 1 LS Clear and Grub Trees 379.3 SQ YD Remove Bituminous Pavement 38 SQ FT Remove Concrete Pad 359 CU YD Salvage Wood Chips 206 CU YD Common Excavation 94 CU YD Contractor Furnished Borrow 656 TON Aggregate Base Class 5 205 TON 2.5-Inch Type SP 9.5 Wear Course Mixture (3,B)(SPWE340B) 75 SQ FT 4-Inch Concrete Pad 111 CU YD Install Salvaged Wood Chips 152 CU YD Install Salvaged Topsoil 78 LB Fertilizer Type 3 (Slow Release) 67 LB Hydraulic Stabilized Fiber Matrix (SFM) 1 EACH Install Inlet Protection 340 LIN FT Install Silt Fence 2 EACH Lighting Unit Type Special 1 1 EACH Lighting Unit Type Special 2 1 EACH Light Foundation Design E Modified 2 EACH Light Foundation Design Special 1 EACH Service Cabinet 1 EACH Equipment Pad 1 EACH Service Equipment 5 EACH Handhole 2,780 LIN FT 1-Inch Non-Metallic Conduit 4,425 LIN FT Underground Wire 1/C 10 AWG 2,845 LIN FT Underground Wire 1/C 12 AWG 1 LS Shelter Site Prep 1 LS Shelter The Bidding Documents may be seen at the Issuing Office of SEH located at 1200 25th Avenue South, P.O. Box 1717, St. Cloud, MN 56302-1717, 320.229.4300.

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents