Similar Projects
Annual Contracts
Infrastructure
Bidding
Stanford, KY

Asphalt Material (Surface, Binder and Base), Culvert (Plastic & Metal), Stone, RS-2 Oil, Cold Patch and On and Off Road Fuel
Infrastructure
Bidding
Williamsburg, KY

2021 Materials Bid
Term Contract
Post-Bid
Erlanger, KY

Road Materials
Post-Bid
Elizabethtown, KY

Material Bid Copper
Results
Erlanger, KY 41018

Aggregate Materials
Results
Erlanger, KY

Stone
Post-Bid
Danville, KY

Asphalt Rejuvenation
Results
Lexington, KY 40502

Ready-Mixed Concrete
Term Contract
Post-Bid
Owensboro, KY

Ready-Mixed Concrete
Infrastructure
Results
Owensboro, KY

Rock, Sand and Backfill Materials
Post-Bid
Owensboro, KY

Hot-Mix Asphalt
Infrastructure
Results
KY

Pickup and Miscellaneous Bituminous Concrete Paving
Term Contract
Post-Bid
Owensboro, KY

Dissolved Sulfide Control Treatment
Alteration
Results
Erlanger, KY

Purchase of Aggregates
Post-Bid
Louisville, KY

Reported 06/11/2022 12:00 AM
Project Title

Number 9 Crushed Stone, Number 3 Crushed Stone, Dense Grade Aggregate, Camden Rock, Limestone, Rip Rap, and Coarse Sand

Physical Address View project details and contacts
City, State (County) Hickman, KY   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Aggregates
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Galvanized Spiral Pipe (16 gauge up to 48 inches & 12 gauge for over 60 inches & N12 Double Wall Plastic Pipe 15 to 24 inches), Emulsified Asphalt, RS2, Gasoline (no less than 87 Octane) non-alcohol 500 gallon lots, No. 2 Diesel fuel (good grade) 500 gallon lots, F.O.B. Fulton County Road Department. Bids for No. 9 Crushed Stone, No. 3 Crushed Stone, Dense Grade Aggregate, Camden Rock, Limestone, Rip Rap, and Coarse Sand. (A) Price per ton picked up at location. (B) Price per ton delivered F.O.B. Fulton County Road Department. This material is for use during the Fiscal Year ending June 30, 2023.

Details

Division 32 - Exterior Improvements, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents