Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

FMS - Facilities Support: Maintenance and Repair BPA
Term Contract
Bidding
$2,500 to $300,000 est. value
Roseburg, OR 97471

OR99: Urban Upgrade (Cottage Grove) on Goshen-Divide Highway (Rt. No. OR99) in Cottage Grove
Infrastructure, Alteration
Bidding
$2,000,000 to $5,000,000 est. value
OR

Franklin K-8 Renovation
Alteration
Post-Bid
Corvallis, OR

Hills Creek Dam Electrical Reliability Upgrades
Renovation
Post-Bid
$5,000,000 to $10,000,000 est. value
Oakridge, OR 97463

Senior Center Solar Panel Project
Alteration
Results
$132,800 est. value
Redmond, OR 97756

Gateway and Franklin Emx LED Lighting Upgrade
Alteration
Results
Eugene, OR

Walton MV Service and Switch Installation
Alteration
Bidding
Eugene, OR

John Day Dam Turbine Runner Replacement and Generator Rewind Project - 90% Review
Renovation, Term Contract
Post-Bid
$500,000,000 est. value
Rufus, OR 97050

Water Treatment Plant Standby Generator
Alteration
Results
Roseburg, Winchester, OR 97495

On-Call Electrical Services
Term Contract
Bidding
$125,000 est. value
Coos Bay, OR

Multiple Building Electrical System Evaluation
Term Contract, Alteration
Post-Bid
Estacada, OR 97023

Two 1500 or 2000 KVA 3 Phase Substation Regulators
Alteration
Results
Eugene, OR

UO Baker Center Roof Replacement PH2 Area F
New Construction, Demolition, Alteration
Bidding

Reported 02/10/2022 11:56 AM
Project Title

Supplemental Electrical Services

Physical Address View project details and contacts
City, State (County) Hillsboro, OR   (Washington County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The County requires the services of licensed electricians and apprentices to assist County electricians with electrical work. The majority of work performed by the contractor will be scheduled small and large projects with County personnel handling most emergency situations. The first hourly rate is to include labor, consumable materials and supplies, overhead, supervision, mileage, travel time, and truck charge necessary or incidental to providing electrical services. No fees or charges shall be invoiced outside of this rate, with the exception of supplies or materials for projects other than those specifically identified in solicitation which shall be invoiced at cost plus the percentage indicated on the bid for overhead. Contractor shall provide all labor, materials, equipment and supervision to perform electrical services as required by the County. All work shall be performed with any and all applicable building and electrical codes. All workers shall be holders of valid Oregon electrical licenses, as required for work performed. Contractor shall provide a lead electrician for each project with a minimum of five (5) years Journeyman experience. The County reserves the right to supply or specify materials, equipment and subcontractors. The County also reserves the right to reject any materials determined to be unsatisfactory in quality, performance and/or content.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents