Similar Projects
2021 Paving Program
Bidding
$291,563 est. value
Genoa, OH

Park Street Reconstruction
Bidding
$390,000 est. value
Oak Harbor, OH 43449

Caledonia, Cox, and Scorpion Paving Project
Post-Bid
$84,130,850 est. value
Port Clinton, OH 43446

Repairs and Resurfacing - Eastbound and Westbound Roadways
Results
$14,000,000 est. value
Port Clinton, OH

Two Lane Resurfacing - SR 51-01.58 Resurf
Results
OH

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Bidding

State Road CR 8 Improvement Project
Results
Less than $1,098,141 est. value
OH

2020 Chip Seal Surface Treatment of Various Township Roads Project
Results
Less than $269,897 est. value
OH

2020 Asphalt Concrete and Bituminous Surface Treatment of Various Township Roads
Results
Less than $474,371 est. value
OH

Portage River South Road TR 18 Safety Improvement Project
Results
Less than $800,135 est. value
Port Clinton, OH 43452

2020 Jerusalem Township Chip Seal Program
Results
Curtice, OH 43412

Crack and Joint Sealant (MBE Only)
Term Contract
Results

Two Lane Resurfacing - SR 2-10.34 Resurf
Results
OH

Two Lane Resurfacing - SR 579-00.00 Resurf
Results
OH

2020 Striping of Various County and Township Roads Project
Results
Less than $68,960 est. value
OH

Last Updated 03/03/2020 03:50 PM
Project Title

OTT-Jefferson Street Reconstructions

Physical Address View project details and contacts
City, State (County) Port Clinton, OH   (Ottawa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,935,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work consists of the reconstruction of two blocks of Jefferson Street from Third Street to Perry Street including new curbs, walks, drainage, lighting and traffic control upgrades. This will include approximately 1,800 cubic yards of asphalt, 15,000 square feet of concrete walk, 5,100 feet of various sized pipe, 26 light poles and a manufactured water quality system. In addition, a new drainage outlet will be constructed between Perry Street and the Portage River and will include a 20,400 GPM pump station.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents