Similar Projects
Mills Riverside Park Bridge Relocation
Renovation
Conception
Jericho, VT

Huntington BO 1445(38)
New Construction, Infrastructure
Bidding
$1,000,000 to $2,500,000 est. value
VT

Chester BF 025-1(46)
New Construction, Infrastructure
Bidding
$1,000,000 to $2,500,000 est. value
VT

Mills Riverside Park Covered Bridge - Reconstruction Phase 1
Renovation
Post-Bid
Jericho, VT 05465

Chester TAP TA17(9)
Infrastructure
Post-Bid
$500,000 to $1,000,000 est. value
Chester, VT

Brown Schoolhouse Road Pedestrian Bridge Replacement
Results
Norwich, VT

Repair Bridge Brunswick VT
Results
Brunswick, VT 05905

Fort Hill Bridge Removal, Stream Restoration and Route 15 Wildlife Passage Project
Construction
Less than $141,902 est. value
Williston, VT 05495

Leicester BO 1445(37)
New Construction, Infrastructure
Bidding
$500,000 to $1,000,000 est. value
VT

Repairing Bridge Abutments
Results
Charlotte, VT

Swanton-Highgate STP PS22(3)
New Construction, Infrastructure
Bidding
$2,500,000 to $5,000,000 est. value
VT

Florence Bridge Installation
Results
Florence, VT 05744

Walden STP SCRP(27)
New Construction, Infrastructure
Bidding
$500,000 to $1,000,000 est. value
Walden, VT

Newbury WCRL (23) and Coventry WCRL (22)
Results
$1,000,000 to $2,500,000 est. value
Coventry, Newbury, VT 05033

Calais BHF 037-2 (10) and Calais BHF 037-2 (11) and Calais BHF 037-2 (12)
Results
$2,500,000 to $5,000,000 est. value
Calais, VT 05648

Last Updated 11/30/2021 10:30 AM
Project Title

Stoney Brook Bridge Repair Project

Physical Address View project details and contacts
City, State (County) Northfield, VT   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $335,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project involves the removal of the existing bridge deck, repair of abutments and installation of a new two-lane bridge deck. Remove existing bridge deck Repair abutments to accept 24’ roadway with fascia mounted AOT guard rail system Widen approaches for new bridge deck width Repair abutment as needed and remove and replace deteriorated concrete Install new approach guard rail Pave approaches 4’ (2 ½” base 1 ½” top) include new approach width of 24’ and 25’ long and to route 12A intersection. Existing waterway opening must be maintained with new deck Road can be closed for 45 day maximum (May-September)

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents