Similar Projects
Last Updated | 11/30/2021 10:30 AM |
Project Title | Stoney Brook Bridge Repair Project |
Physical Address | View project details and contacts |
City, State (County) | Northfield, VT (Washington County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $335,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project involves the removal of the existing bridge deck, repair of abutments and installation of a new two-lane bridge deck. Remove existing bridge deck Repair abutments to accept 24’ roadway with fascia mounted AOT guard rail system Widen approaches for new bridge deck width Repair abutment as needed and remove and replace deteriorated concrete Install new approach guard rail Pave approaches 4’ (2 ½” base 1 ½” top) include new approach width of 24’ and 25’ long and to route 12A intersection. Existing waterway opening must be maintained with new deck Road can be closed for 45 day maximum (May-September) |
||||||||||||||||||||
Details | Bridge, New Construction.
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |