Similar Projects
Access Road Rehabilitation, Marianna Municipal Airport
Bidding
Marianna, FL 32447

Marianna Site Paving Phase 3
Bidding
Marianna, FL 32448

M.L. King Street Paving
Post-Bid
Jacob City, FL

Paving Project at Apalachee Correctional Institution
Post-Bid
Sneads, FL 32460

FEMA Project 6
Results
Less than $353,885 est. value
Marianna, FL

Design and Performance of Open-Graded Friction Course (OGFC) Mixtures Containing Epoxy Asphalt
Results

Pavement Markers: Raised and Reflectorized and Related Materials (Supplemental Bid)
Term Contract
Results

Jackson Road from Woodrest Road to End Pavement
Results
Marianna, FL

Safety Project
Results
est. value

Road Grading/Maintenance
Results
FL

Dothan Street Resurfacing
Results
Less than $150,000 est. value
Campbellton, FL 32426

Milling and Resurfacing
Results
Less than $1,500,000 est. value

Widen/Resurface Exist Lanes
Results
Less than $1,901,426 est. value
FL

Hunter's Fish Camp Road from CR 164 to End
Results
FL

Mccormick Lake Roads Project
Results
Less than $639,893 est. value
Marianna, FL 32448

Last Updated 08/07/2019 04:36 PM
Project Title

Hunter's Fish Camp Road from CR 164 to End

Physical Address View project details and contacts
City, State (County) Marianna, FL 32448   (Jackson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The project is to widen and resurface Hunter’s Fish Camp Road from CR 164 (Blue Springs Road) to the end of pavement (approximately 0.85 miles). The existing lanes are 10' and will be widened to 11 feet. The road will be widened using black base, unsuitable material will be dug out, all asphalt will receive tack coat, a crack relief layer will be applied, a 1-1/2" layer of SP 12.5 structural asphalt will be placed, and a 1" finish course of SP 9.5 will be placed. Driveway aprons will be paved, cross drain pipes will be replaced as indicated including mitered ends or headwalls, all pipes will be cleaned prior to final inspection, ditches will be cleaned to provide positive flow and at cross pipes, driveway pipes will be cleared of debris or replaced if indicated (including mitered ends), trees and brush will be trimmed as indicated to provide sufficient sight distance, striping will be placed on the finish asphalt, sod will be placed beside the road and mitered ends and other disturbed areas will receive hydro-seed, signs will be replaced as indicated.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents