Similar Projects
Mixed Use Commercial Structures
New Construction - 170,000 SF
Design
Less than $200,000,000 est. value
Naperville, IL 60563

Garden Station
New Construction - 9,000 SF
Design
$120,000,000 est. value
Villa Park, IL 60181

Target #T0840 - Cafe Remodel
Renovation - 1,276 SF
Post-Bid
Naperville, IL 60540

Panda Express
New Construction, Demolition - 2,300 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
Willowbrook, IL 60527

Naperville Crossings Building 7
New Construction - 4,768 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Naperville, IL 60564

Olive Garden
Renovation - 8,816 SF
Construction
Naperville, IL 60566

PAS Plaza
New Construction - 10,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Aurora, IL

Dunkin` Donuts
New Construction - 2,800 SF
Pending Verification
Itasca, IL 60143

Culver's
New Construction
Design
$1,000,000 est. value
Bloomingdale, IL 60108

Burger King #11321
Renovation - 3,000 SF
Post-Bid
Aurora, IL 60502

Mix Used & Mixed Tenant Commercial Buildings
New Construction, Renovation - 162,363 SF
Construction
$4,900,000 est. value
Hanover Park, IL 60133

The Hive Tavern and Eatery
Renovation
Pending Verification
Saint Charles, IL 60174

Olive Garden
Build-Out - 7,818 SF
Post-Bid
Lombard, IL 60148

The Matrix: Banquet Hall, Entertainment Destination
Renovation - 136,446 SF
Construction
Aurora, IL 60504

Go Brewery
Build-Out - 7,000 SF
Pending Verification
Naperville, IL 60540

Reported 05/04/2022 12:00 AM
Project Title

First Watch Daytime Cafe

Physical Address View project details and contacts
City, State (County) Bloomingdale, IL 60108   (DuPage County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method Bids by Invitation.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Food/Beverage Service, 6,666 SF Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents