Similar Projects
Last Updated | 06/15/2022 03:11 PM |
Project Title | Design of the Paseo Real Wastewater Treatment Facility San Juan Chama Project Return Flow Pipeline |
Physical Address | View project details and contacts |
City, State (County) | Santa Fe, NM (Rio Arriba County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The selected firm will take the return flow pipeline from the current preliminary/planning design phase to a completed design for the construction bidding phase. A preliminary design evaluation report (2019) presents four conceptual scenarios for design of the return flow pipeline. These scenarios evaluate potential flow rates using existing infrastructure for portions of the pipeline as well as higher flow scenarios with all new infrastructure. Based on the recommendations in that report as well as long term water reuse and return flow planning by the City, the design requested in this RFP shall utilize new infrastructure but may be augmented with existing infrastructure. The design shall follow a 30-60-90% design process appropriate for capital projects with a final review leading to a 100% bid package. Engineering evaluations and decision points are described below. The primary tasks include: 1. Establish the pipeline location within the corridor from the PRWRF to an effluent discharge point downstream of the BDD diversion. 2. Evaluate design alternatives based on engineering design principals, lifecycle cost and value to the City. Prepare preliminary engineering/basis of design report 3. Design of the pipeline including all necessary structures, equipment, piping, appurtenances, hydraulic analysis, and design features necessary for efficiently and reliably conveying the water from the PRWRF to the point of discharge. a. 30% design review b. 60% design review c. 90% design review d. 100% design 4. Provide bid phase services to the City 5. Provide construction phase services to the City 6. Support public outreach and permitting activities associated with the project. This task will be limited to design related materials requested periodically by the City. Permitting and public outreach to be led and managed by others. For Zoom Meeting click at https://santafenm-gov.zoom.us/j/98692698721?pwd=ckJXcWtqMU9yMTQ4eWxDVkhhV1hRdz09 Meeting ID: 986 9269 8721 Passcode: 056801 Call-in numbers (by location) +1 669 900 6833 US (San Jose) +1 253 215 8782 US (Tacoma) +1 346 248 7799 US (Houston) +1 929 205 6099 US (New York) +1 301 715 8592 US (Washington DC) +1 312 626 6799 US (Chicago) |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |