Similar Projects
Saylorville Shoreline Erosion Protection Project
Term Contract
Design
Johnston, IA 50131

PCC Patching
Infrastructure
Bidding

Slope Protection
Infrastructure
Bidding
IA

Commerce Crossings Development Public Improvements
Infrastructure
Post-Bid
Bondurant, IA

Commerce Crossings Development Public Improvements
Infrastructure
Post-Bid
Bondurant, IA

8th Street SE Water and Sewer Extensions
Results
$1,463,902 est. value
Altoona, IA

2021 PCC Street Patching Program
Infrastructure
Results
$446,625 est. value
Ankeny, IA

2022 Street Reconstruction Project
Infrastructure
Bidding
$1,280,000 est. value
West Des Moines, IA 50265

Truck Entrance Road Rehab and Replacement
Infrastructure
Post-Bid
Johnston, IA

2021 HMA Residential Paving Program Contract 2
Infrastructure
Results
$800,000 est. value
Des Moines, IA

NW 36th St and NW Weigel Dr Water Main
Infrastructure
Bidding
$1,400,000 est. value
Ankeny, IA 50023

Camp Dodge S-05 Parking Lot and S-38 Drainage Improvements
Infrastructure
Post-Bid
Johnston, IA

Western Ingersoll Run Sewer Separation Phase 2
Alteration
Results
$6,750,000 est. value
Des Moines, IA

NW 36th Street And NW State Street Interim Improvements
Infrastructure
Bidding
$712,129 est. value
Ankeny, IA 50023

Camp Dodge Truck Entrance Road Rehab and Replacement
Renovation, Infrastructure
Post-Bid
Johnston, IA 50131

Last Updated 02/09/2022 09:34 AM
Project Title

Martha L. Miller Drive East Extension

Physical Address View project details and contacts
City, State (County) Pleasant Hill, IA 50327   (Polk County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes all materials, equipment, transportation, and labor necessary to complete the roadway extension. The proposed project includes the development of the trail south of Martha L. Miller Drive and construction of 2,525’ of Martha L. Miller Drive between North East 70th Street and North East 75th Street. The project also includes storm sewer installation, water main installation, RCB culvert installation and other miscellaneous work to complete the improvements. Should the contractor fail to complete all grading, pavement removal, storm sewer installation, RCB culvert installation, water main installation, subdrain, subgrade preparation, modified subbase, PCC pavement, pavement markings, and miscellaneous associated work in this timeframe, liquidated damages in the amount of one thousand dollars ($1,500.00) per calendar day after December 1, 2022 will be assessed. Surface restoration shall be fully completed by June 1, 2023 or incur liquidated damages in the amount of one thousand dollars ($1,000.00) per calendar day thereafter.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents