Similar Projects
Preservation Square Phase 2A - Site Prep Package
Renovation
Post-Bid
Saint Louis, MO 63106

Preservation Square Phase 2B - Site Prep Package
Infrastructure
Post-Bid
Saint Louis, MO 63106

Sitework Services
Term Contract
Results
Columbia, MO

McGrath Elementary School and ECC Sitework Package
Results
Brentwood, MO 63144

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Weise House in Street Ferdinand Park Basement Work and Grading
Infrastructure
Results
Florissant, MO

Excavating and General Maintenance Services
Term Contract, Infrastructure
Post-Bid
Sparta, MO

Gateway Arch National Park Site Improvements
Infrastructure
Results
Saint Louis, MO

Badenhaus Apartments Site Improvements
Infrastructure
Post-Bid
Saint Louis, MO 63147

Engine House 2 and 3
New Construction
Results
Saint Louis, Wildwood, MO 63005

Eastowne Business Park - Mass Grading
Infrastructure
Post-Bid
Saint Joseph, MO

Harrison County Bridge 6870010-1 East Fork Big Creek
New Construction, Infrastructure
Results
$600,000 to $850,000 est. value
Bethany, MO 64424

Rehabilitation of Abandoned Property
Renovation, Infrastructure
Post-Bid
Ferguson, MO

2021 Shalimar Park Field Grading
Infrastructure
Results
Grandview, MO 64030

Riverside Redx CID Site Improvements Lot 2 And Riverside Redx Site Improvements Lot 1
New Construction, Alteration - 62,497 SF
Post-Bid
Riverside, MO 64150

Last Updated 08/29/2022 08:02 PM
Project Title

T-Hanger Installation

Physical Address View project details and contacts
City, State (County) Lebanon, MO 65536   (Laclede County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Aircraft Hangar, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Lebanon, Missouri (The City) invites bids from qualified organizations for the installation of a 60ft x 111ft FulFab, LK 44, 4-Bay T-Hanger at the Floyd W. Jones Airport located at 2415 S. Jefferson, Lebanon, Missouri. This bid shall include all material equipment, demolition, labor and/or services required to complete this project as specified herein for the City of Lebanon. The successful provider shall enter into an agreement in a form substantially similar to the Citys Form of Agreement; such Agreement shall embody the requirements and terms and conditions of the Invitation For Bids and the Bids as accepted by the City. The completion date for this project will be no later than one hundred twenty (120) calendar days upon executed Notice to Proceed. A $200.00 per day penalty will be assessed to the supplier if this project is not completed. If an extension is needed to complete this project due to a change order, it will be done by a signed change order by the owner and supplier Question Cuttoff Date & Time 8/29/2022 01:00:00 PM (ET)

Details

6,660 SF.
Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Rigid Paving, Concrete Paving, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents