Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

I Street Bridge Replacement / Sacramento
New Construction, Infrastructure
Design
$210,000,000 est. value
West Sacramento, CA 95605

Groundwater Wells Demolition Project
Demolition, Infrastructure, Renovation
Bidding
$375,000 CJ est. value
Woodland, CA 95695

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Excavation Services
Infrastructure
Post-Bid
$80,000 est. value
CA

HMA Concrete Grinder Dig out Repair and Replacement Paving
Infrastructure
Results
CA

Place polyester concrete overlay
Infrastructure
Results
$2,050,000 est. value

Dutch Bros Coffee - Ikea Court / West Sacramento
New Construction, Infrastructure - 950 SF
Pending Verification
$287,000 CJ est. value
West Sacramento, CA 95605

Home2Suites by Hilton Development / Woodland
Demolition, New Construction, Infrastructure - 68,000 SF
Pending Verification
$25,000,000 CJ est. value
Woodland, CA 95695

River II
New Construction, Infrastructure - 1,500 SF
Design
$50,000,000 CJ est. value
West Sacramento, CA 95605

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Replace Culverts and Install Cured in-Place Pipeliners
Infrastructure
Results
$540,000 est. value
CA

River One
New Construction, Infrastructure
Pending Verification
$70,000,000 CJ est. value
West Sacramento, CA 95691

Bretton Woods
New Construction, Infrastructure
Design
$190,000,000 CJ est. value
Davis, CA 95616

2022 Chip Seal Project
Infrastructure
Post-Bid
Woodland, CA

Last Updated 09/28/2022 01:43 AM
Project Title

Matmor Road and East Gum Avenue Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Woodland, CA 95695   (Yolo County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $5,191,118 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project will reconstruct Matmor Road from E. Main Street to Gibson Road, and E. Gum Avenue from East Street to Matmor Road. The project will reconstruct the roadway using Full Depth Reclamation (FDR), update curb ramps to current accessibility standards (ADA), construct driveway and sidewalk repairs, install concrete bus pads, update traffic signal equipment/controllers, modify existing Radar Speed Feedback Sign system, minor storm drain improvements and restripe the roadway with narrower travel lanes, buffered bike lanes and green MMA bike lane system The City's estimated cost of the improvements for base bid only is $5,500,000 to $6,500,000 Any questions regarding the project shall be submitted in writing to CIP@cityofwoodland.org. All bids must be sealed and accompanied by cash, cashier's check, certified check, or Bid Bond made payable to the City in the sum of not less than ten percent (10%) of the amount of the bid. For the purposes of this Section, the amount of the bid includes all additive alternates but does not include deductive alternates. The cash, cashier's check, certified check or bond shall be given as a guarantee that the successful bidder will enter into a written contract within ten (10) work days after being requested to do so. The bid security will be declared forfeited if the successful bidder fails to comply within said time. Upon an award to the successful bidder, the security of bidders shall be returned in a reasonable period of time. Bidders are hereby notified that in accordance with the provisions of Public Contract Code section 22300, securities may be substituted for any monies which the City may withhold pursuant to the terms of this Contract to ensure performance.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents