Similar Projects
California Waste Solutions Recycling Facility
New Construction - 170,765 SF
Design
$10,000,000 CJ est. value
Oakland, CA 94607

City Distribution Division Campus at 2000 Marin
New Construction, Demolition
Bidding
$225,000,000 est. value
San Francisco, CA 94124

Plant Structural Improvements
New Construction
Bidding
$2,500,000 est. value
Modesto, CA 95351

Biosolids Digester Facilities - Southeast Treatment Plant Electrical Package 1
New Construction
Sub-Bidding
San Francisco, CA

Digester 1 Rehabilitation
Renovation
Sub-Bidding
Redwood City, CA

Process Control Systems Integrator (PCSI) Supply and Installation
New Construction
Post-Bid
San Francisco, CA

Wastewater Treatment Plant Improvement Project
New Construction
Post-Bid
Riverdale, CA

Biosolids Digester Facility - Building 610 Wave 1
New Construction
Results
$939,000,000 est. value
San Francisco, CA 94124

Water Recycling Facility Advanced Water Treatment Facility Project
New Construction, Renovation
Results
$15,000,000 est. value
Santa Paula, CA 93060

Southeast Plant New Headworks Construction - Scope III
New Construction
Bidding
San Francisco, CA

ATS Replacement at Sutter WWTP
Renovation
Post-Bid
$780,000 est. value
Modesto, CA 95351

Water Pollution Control Plant Building 042 Primary Clarifier Improvements
Renovation
Results
$6,500,000 to $7,000,000 est. value
San Francisco, CA

New Treasure Island Wastewater Treatment Plant
New Construction
Bidding
$158,000,000 est. value
San Francisco, CA 94130

Primary Clarifier Rehabilitation No 2 and 4
Renovation
Post-Bid
$950,000 est. value
Fairfield, CA 94534

Install Water/Wastewater Systems and Landscape Work
New Construction
Results
$7,100,000 est. value
CA

Last Updated 02/11/2022 03:30 PM
Project Title

Digester No 4 Coating and Annular Seal Repair

Physical Address View project details and contacts
City, State (County) Sunnyvale, CA 94089   (Santa Clara County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Digester No.4 Coating and annular seal repair. at the Water Pollution Control Plant, including furnishing all labor, supervision, written reports, methods and processes, implements, tools, machinery, equipment, transportation and materials for removing and managing vegetation.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents