Similar Projects
Erie WWTP Ash Slurry Pump Replacement - General Construction
Infrastructure
Bidding
$724,800 est. value
Erie, PA 16507

Pump Station 5 Part II Permit Improvements - General/Building Contract
Addition, Infrastructure
Bidding
Tannersville, PA 18372

WWTP Grey Water Pumps
Post-Bid
Less than $72,000 est. value
Pittsburgh, PA 15222

Swale Brook Well House Improvements
Post-Bid
Tunkhannock, PA 18657

Repair Portable Pumps -Godwin
Term Contract
Results
Philadelphia, PA 19153

Trailer Mounted Mobile Dewatering Unit
Results
Less than $6,000 est. value
Catawissa, PA

Well Construction and Well Field Piping for West 2nd Street Well No 4 and Water Booster Pump
Infrastructure
Bidding
Waterford, PA

Pre-Fabricated Precast Reinforced Concrete Well Building
Post-Bid
Wellsboro, PA 16901

Water Pollution Control Plant and Pump Station Improvements
Results
Jamestown, PA 16134

Totem Road Pump Station Drywell Pipe Painting and Improvements
Infrastructure, Alteration
Bidding
$95,000 est. value
Bensalem, PA 19020

EBTMA Sampling and Analysis of Groundwater Monitoring Wells
Post-Bid
$30,000 est. value
Downingtown, PA 19335

Fords Corner Area Wastewater System Extension (Contracts 1-2)
Results
Johnstown, PA 15901

Wells 10, 17, and 21 PFAS Treatment Systems - General and Mechanical Construction
Infrastructure
Bidding
Horsham, PA

Sonic Drilling Harlansburg 7.5-Minute Quadrangle
Post-Bid
Slippery Rock, PA 16057

Glannons Pump Station and Force Main Upgrade - General/Mechanical Construction
Results
Allison Park, PA 15101

Last Updated 09/16/2021 12:45 PM
Project Title

Cleaning Out and Plugging One Abandoned Well, Ross Township, Allegheny County

Physical Address View project details and contacts
City, State (County) PA   (Allegheny County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 to $299,999
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1 Site Preparation/Restoration and E&S Controls. 1 Lump Sum 2 Mobilization/Demobilization of Basic Plugging Rig and Related Equipment. 1 Lump Sum 3 Plugging Rig Operation Time. 150 Hour 4 Stand-by Time. 1 Hour 5 Power Swivel and Mud Pump (As Necessary). 15 Day 6A Blowout Prevention Installation of well control string, (if necessary) - Labor 20 Hour 6B Blowout Prevention Installation of Well Control Casing String, (if necessary) - Materials 500 Ft 6C Blowout Prevention Installation of Well Control Casing, (if necessary) - Equipment 1 Unit 7 Borehole Wireline Services (Logging, Shooting, Camera, Etc.). 1 Invoice $15,000.00 8 Portland Cement Mixed and Emplaced in Wellbore. 500 Sack 9 Bentonite Powder Mixed and Emplaced in Wellbore. 50 Sack 10 Lost Circulation Material Mixed and Emplaced in Wellbore. 5 Sack 11 Material (Gravel) in Surface Hole. 1 Invoice $3,000.00 12 Fresh Water Supply. 500 Bbl. 13 Waste Fluid Disposal Cost at Treatment Facility. 1 Invoice $5,000.00 14A Fish Tool Rental - Labor 50 Hour 14B Fishing Tool Rental - Equipment. 50 Hour 14C Special Milling and Drilling Bits (as needed) 1 Invoice $7,500.00 15A Flat-Bed Truck. 40 Hour 15B Tractor-Trailer Truck. 80 Hour 15C Water Truck, Disposal, and Supply Hauling Truck. 80 Hour

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents