Similar Projects
Palm Beach Shores Water Main Improvement Project
Bidding
Riviera Beach, FL 33404

Unit 53 Arden - Parcels J, G-South and I-South Public Improvement Project
Bidding
North Palm Beach, FL

Pipeline Wet Tapping and Line Stop Continuing Construction Contract
Term Contract
Post-Bid
$5,500,000 est. value
West Palm Beach, FL 33416

Pipeline Cleaning Services
Term Contract
Post-Bid
West Palm Beach, FL 33415

46--Water Purification System
Results
Palm Beach Gardens, FL 33410

N--Domestic Water Isolation (Shutter) Valves (Va-19-00034342)
Results
Palm Beach Gardens, FL 334106400

Raw Watermain Improvements for Surficial Aquifer (SA) Wells 8A-12A and Site Demolition for SA Wells 6-12 (W1817B)
Bidding
Jupiter, FL 33458

Aerial (Pipe) Crossing, Maintenance Services
Term Contract
Post-Bid
Palm Beach, FL

Water Main Improvements: 31st, 32nd, 33rd, 34th and 35th Streets
Results
West Palm Beach, FL

Reclaimed Watermain for Area 10
Post-Bid
Delray Beach, FL

1 Million and 3 Million Storage Tanks Pressure Sustaining Valve Replacement
Results
Less than $135,000 est. value
Boynton Beach, FL 33425

Pre-Qualification of Vendors Ductile Iron-Pipe and Fittings
Term Contract
Post-Bid
West Palm Beach, FL

Reduced Pressure Principle Backflow Prevention Assemblies
Results
FL

Osceola Park Neighborhood Improvements (Phase II)
Post-Bid
Delray Beach, FL

Osceola Park Neighborhood Improvements (Phase 1)
Results
Less than $5,000,000 est. value
Delray Beach, FL 33444

Last Updated 05/01/2020 02:17 PM
Project Title

State Road A1A Water Main Improvements - Phase 2

Physical Address View project details and contacts
City, State (County) Gulf Stream, FL   (Palm Beach County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000 to $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all labor, materials, equipment, incidentals and appurtenances for the installation of a 12-inch and 8-inch water main by open-cut methods and directional drill methods, including fittings, restraining devices, valves, water services, fire hydrants, connections to existing systems and abandonment, grouting and/or removal of existing water main. A portion of the work is along State Road A1A, which is within Florida Department of Transportation rights-of-way. Construction also includes clearing and grubbing, dewatering, maintenance of traffic, pavement restoration, pavement markings, driveway restoration, complying with permit conditions, testing and all site restoration work for a complete and operating system.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents