Similar Projects
Z--Romo HQE Waterline Rehab Phase 7 & 8
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Estes Park, CO

Enclave at Redwood
New Construction, Infrastructure
Design
$91,000,000 est. value
Fort Collins, CO

Contractor - 24 Inch Waterline Reroute Project
Infrastructure
Bidding
$300,000 est. value
Fort Collins, CO

Solid Waste Diversion Facilities and Emerging Technologies - P3 opportunities
New Construction, Infrastructure
Bidding
$2,500,000 CJ est. value
Fort Collins, CO 80521

On Call Miscellaneous Concrete Services
Term Contract
Sub-Bidding
Berthoud, CO 80513

Pavement Markings On-Call
Term Contract
Sub-Bidding
Fort Collins, CO 80521

Estes Park Campground at Mary's Lake Water and Electrical Distribution System Improvements Phase 2
Post-Bid
$500,000 est. value
Estes Park, CO 80517

Construction of the Kinston Welcome Center
Post-Bid
Loveland, CO

Copper Ridge Connector Trail
Results
Loveland, CO

CM/GC Services for the 2020 Alley Program - Tenney Court North and West Oak Alleys
Renovation
Results
Fort Collins, CO 80522

Berthoud Commons
New Construction
Construction
Berthoud, CO 80513

Thompson River Ranch Clubhouse - Phase I Site Improvements
Infrastructure
Construction
Johnstown, CO 80534

Outdoor Vehicle Storage
New Construction
Pending Verification
Fort Collins, CO 80524

Beckman Coulter Life Sciences Bioscience Manufacturing Facility Development Phase 2
New Construction, Infrastructure - 56,000 SF
Pending Verification
$9,000,000 CJ est. value
Loveland, CO 80537

Hughes Stadium Subdivision
New Construction, Infrastructure
Design
$274,000,000 CJ est. value
Fort Collins, CO 80524

Last Updated 08/02/2022 09:32 AM
Project Title

Castlerock - Phase 2

Physical Address View project details and contacts
City, State (County) Fort Collins, CO 80521   (Larimer County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $610,439 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Castlerock - Phase 2, consists of concrete roadway improvements along Castlerock Drive and at the intersections of Springfield Drive and Clearview Avenue. Improvements consist of removal of existing concrete pavement, reset manholes and valve boxes, replacement of 8-inch concrete pavement per CDOT standards, concrete jointing, and asphalt patching. This work was previously bid as 9527 - additional work has been added in ITB 9599. General Requirements - Bid Deposit Required - Insurance Required - Local Service Required Bonding Requirements Buyer Requires E-Bonding - Bid Bond 5 % Question Acceptance Deadline 06/06/2022 05:00 PM EDT Questions are submitted online No

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents