Similar Projects
Last Updated | 03/27/2023 06:05 PM |
Project Title | Abatement |
Physical Address | View project details and contacts |
City, State (County) | Manitou Springs, CO 80829 (El Paso County) |
Category(s) | Single Trades |
Sub-Category(s) | Environmental |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of March 20th, Addendums 1-3 are available. Contact owner for more information. Bid Intent Not Available Question Acceptance Deadline 03/13/2023 02:00 PM EDT Questions are submitted online Yes Manitou Springs School District 14 (MSSD) is issuing this Request for Proposals (RFP) from qualified contractors/companies to provide all services for the complete abatement and disposal of Asbestos Containing Materials. This will be for the floor tile and mastic at Mantiou Springs Elementary School (MSES). As well as the floor tile and mastic as well as drywall at Ute Pass Elementary School (UPES). See attached reports in Exhibit B for additional information on the floor tile, mastic and drywall. Project Locations: Manitou Springs Elementary School (MSES) - 110 Pawnee Ave, Manitou Springs, CO 80829. Ute Pass Elementary - 9230 Chipita Park Rd., Cascade, CO 80809. Construction work will be done over the summer and abatement can start right after the end of students being in the building. Prep work and site setup can happen prior to school being out. The preferred maximum abatement window is May 26th thru June 9th 2023. See Exhibit C and Exhibit D for maps showing the location of removal of the flooring and mastic as well as the drywall in UPES. For drywall removal in many areas the scope is to remove the studs as well as part of the abatement process. MSSD will use their General Contractor to come in prior to abatement to make save all electrical, remove and shutoff all plumbing and demo cabinets and other items that may be on flooring to be abated. It should be that the selected abatement contractor will need multiple coordination meetings with the General contractor to confirm scheduling of the work. General Requirements - License Required |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |