Last Updated | 05/09/2023 04:22 PM |
Project Title | Wastewater Collection and Treatment Facility Improvements Project Phase 3: Collection System |
Physical Address | View project details and contacts |
City, State (County) | Leavenworth, WA 98826 (Chelan County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $2,004,972 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project generally consists of constructing the following improvements: o Cleaning and internal CCTV inspection of approximately 13,000 If of 8"-15" wastewater pipelines o Root removal o Sanitary sewer bypass pump-ing o CIPP liner installation in approximately 11,800 If of 8"-15" wastewater pipelines o Re-establishment of approxi-mately 250 4"-6" sewer service connections Open cut repair or CIPP liner repair of existing 8" wastewater pipelines at 10 locations including excavation, pipe and fittings, bed-ding, backfill and compaction o Installation of 3 wastewater manholes to replace existing clea-'louts including excavation, bed-ding and backfill Associated work including con-struction surveying and staking; existing monument and survey marker location, protection and/or replacement; miscellaneous land-scape and surface restoration The Project generally consists of constructing the following improvements: o Cleaning and internal CCTV inspection of approximately 13,000 If of 8"-15" wastewater pipelines o Root removal o Sanitary sewer bypass pump-ing o CIPP liner installation in approximately 11,800 If of 8"-15" wastewater pipelines o Re-establishment of approximately 250 4"-6" sewer service connections Open cut repair or CIPP liner repair of existing 8" wastewater pipelines at 10 locations including excavation, pipe and fittings, bed-ding, backfill and compaction o Installation of 3 wastewater manholes to replace existing cleanouts including excavation, bed-ding and backfill oAssociated work including construction surveying and staking; existing monument and survey marker location, protection and/or replacement; miscellaneous land-scape and surface restoration Additional bid acceptance and contract award provisions are specified in the Contract Documents. For additional information regarding this project, contact Mark Johnson, RE. at Varela Engineering & Management at mjohnson@varela-engr.com Instructions to Bidders For other requirements regarding bid submittal, qualifications, procedures, and contract award., refer to the Instructions to Bidders and other documents that are included in the Bidding Documents, American Iron and Steel Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials. |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |