Similar Projects
Replace Roof - Kenosha County Detention Center - Facilities -17 - Kenosha County
Renovation
Conception
$950,000 CJ est. value
Kenosha, WI 53144

Replace Hot Water System - Facilities-21 - Kenosha County - Purchasing
Renovation
Conception
$300,000 CJ est. value
Kenosha, WI 53144

Attorney Visitation Booth Renovation
Renovation
Design
$200,000 CJ est. value
Appleton, WI 54911

Fox Lake Correctional Institution HSU-Food Service Roof Replacement - State of Wisconsin - Department of Corrections
Renovation
Design
$1,615,200 est. value
Fox Lake, WI

Bathroom Remodel Housing Unit 7 - GPC
Build-out
Bidding
$350,600 CJ est. value
Fox Lake, WI 53933

North Building Units 9 And 10 Wet Cell Remodel - GPC BIDDERS
Renovation
Bidding
$4,500,000 CJ est. value
Oshkosh, WI 54901

Rock County Jail / LES - BP#1 Footing and Foundation
Renovation
Post-Bid
$25,000 est. value
Janesville, WI 53545

LES / Jail All Work
Renovation
Post-Bid
$100,000 est. value
Janesville, WI 53545

Fire Alarm Upgrade
Alteration
Results
$2,375,500 est. value
Sturtevant, WI 53177

New Jail Sallyport
New Construction
Results
$1,740,000 est. value
Montello, WI 53949

Fire Alarm Replacement
Renovation
Construction
$1,846,891 CJ est. value
Oregon, WI 53575

New Health Services Unit, Stanley Correctional Institution
Addition
Pending Verification
$8,213,000 CJ est. value
Stanley, WI 54768

RFQ Engineering - OCI Steam Line Pit C to Heating Plant
Renovation
Pending Verification
$2,000,000 CJ est. value
Oregon, WI 53575

Racine Youth Offender Correctional Facility - Lobby Hardening - State of Wisconsin - Department of Corrections
Renovation
Design
$462,000 est. value
Racine, WI 53404

North Building Units 9 and 10 Wet Cell Remodel - MEP
Build-out, Renovation
Bidding
$655,955 CJ est. value
Oshkosh, WI 54901

Last Updated 10/09/2023 11:08 AM
Project Title

Boiler Controls Replacement Heating Plant

Physical Address View project details and contacts
City, State (County) Allouez, WI 54301   (Brown County)
Category(s) Government/Public
Sub-Category(s) Prison/Jail
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $3,997,465 [brand] Estimate
Plans Available from Structural Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Section includes cast-in-place concrete, including formwork, reinforcement, concrete materials, mixture design, placement procedures, and finishes. The work under this section consists of providing all work, materials, labor equipment and supervision necessary to provide cast in-place concrete as required in these specifications and the drawings. Demolition of existing boiler controls on 4 boilers and balance of plant controls. Installation of new PLC based controls on 4 boilers as well as new balance of plant controls This work also includes the installation of a new Operators Control Room and storage area. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. Owner will engage a qualified independent testing agency to sample paint material being used. Samples of material delivered to Project will be taken, identified, sealed, and certified in the presence of Contractor. The A/E or DFD reserves the right to test the work of any welder employed on the project, at the Contractor's expense.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents