Similar Projects
Groundwater Well Field and Transmission Construction - WIF32 - City of Bozeman
Infrastructure
Conception
$7,500,000 CJ est. value
Bozeman, MT 59715

Oak & 19th Intersection Improvements - SIF147 - City of Bozeman
Alteration
Conception
$750,000 est. value
Bozeman, MT 59718

Story Mill Road Reconstruction From Bridger to Griffin and Bridger/ Story Mill Intersection Improvements Project
Infrastructure
Design
$300,000 CJ est. value
Bozeman, MT 59715

Story Mill Road Reconstruction From Bridger to Griffin and Bridger/ Story Mill Intersection Improvements Project
Infrastructure
Design
$300,000 CJ est. value
Bozeman, MT 59715

Bozeman Public Library
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$4,500,000 CJ est. value
Bozeman, MT 59715

Municipal Groundwater Test Wells
Infrastructure
Post-Bid
$50,000 CJ est. value
Bozeman, MT 59718

Casting Pond Improvements
Infrastructure
Results
West Yellowstone, MT 59758

Overlay and Chip Seal Frontage Rd W of Columbus Billings Area
Infrastructure
Results

Joint City-County Law and Justice Center - Gallatin County and City of Bozeman
New Construction, Renovation, Infrastructure
Construction
$29,000,000 CJ est. value
Bozeman, MT 59715

Bozeman Gateway Phase 4 Apartments
New Construction, Infrastructure
Construction
$20,000,000 CJ est. value
Bozeman, MT 59718

Bozeman Health Medical Clinic
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Bozeman, MT 59715

Timber Ridge Apartments
New Construction, Infrastructure
Pending Verification
$11,000,000 CJ est. value
Bozeman, MT 59718

West Story Street- 4th to 8th Avenue - SCR27 - City of Bozeman
Infrastructure
Conception
$854,400 est. value
Bozeman, MT 59715

Southside Lofts
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Bozeman, MT 59715

Lone Peak High School - Phase 2 Addition And Renovation - Bid Package #2
Renovation, Term Contract, Infrastructure, Alteration
Post-Bid
Gallatin Gateway, MT

Last Updated 05/23/2023 07:01 AM
Project Title

Great American Outdoors Act - Copper City Road Resurfacing and Realignment

Physical Address View project details and contacts
City, State (County) Three Forks, MT 59752   (Gallatin County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Department of Interior, Bureau of Land Management (BLM), Montana State Office is soliciting proposals for construction activities to resurface approximately 3,200 linear feet of road and align/construct approximately 2,400 linear feet of new roadway in accordance with the technical specification and drawings. The project work is located on BLM lands approximately 37 miles from Bozeman, Montana in Broadwater County. PROCUREMENT OVERVIEW TYPE OF CONTRACT: Construction, Firm Fixed Priced (FFP), Single Award Contract TYPE OF CONSTRUCTION: Highway NAICS CODE: 237310, Highway, Street, and Bridge Construction MAGNITUDE: Between $250,000 and $500,000 RESTRICTIONS ON CONTACTS: Beginning upon release of the request for proposal (RFP) through contract award, contacting Government employees who may be associated with this work by participating offerors about this RFP is inappropriate. Offerors for this RFP, including subcontractors and teammates, shall not attempt such contacts during this period. All correspondence shall be through the Contracting Officer listed below: Bureau of Land Management Attn: Christine Mundt 5001 Southgate Drive Billings, MT 59101 Office Phone: 406-896-5030 Mobile Phone: 406-647-9348 Email: cmundt@blm.gov SITE VISIT: The Government strongly urges offerors to inspect the site to gain a better understanding of the work requirements and to satisfy themselves regarding all general and local conditions that may affect the cost of performance. In no event shall failure to inspect the site constitute grounds for a claim after award. See Section L, Clause 52.236-27 - Alternate I, Site Visit (Construction) - Alternate I for more information. QUESTIONS DUE: March 31 2023, at 5:00 pm, Mountain Daylight Time. Questions submitted after this date and time will not be accepted. All questions must be submitted in writing via e-mail to the Contracting Officer. See Section L, Paragraph Submittal of Questions for more information. PROPOSAL RESPONSE DATE: For dates when contractors are to submit their proposals, see block 13 of Standard Form 1442, "Solicitation, Offer, and Award (Construction, Alteration, or Repair)." See Section L, Instructions, Conditions and Notices to Offerors, for a list of required documents. 4 METHOD OF PROCUREMENT: This procurement is set-aside for Small Business Concerns and is a construction acquisition, pursuant to Federal Acquisition Regulations (FAR) Part 15, Part 19, and Part 36. SAM: Effective July 29, 2012, any contractor interested in doing business with the Federal Government must register in the System for Award Management (SAM) database prior to award of a contract or agreement. SAM is an official website of the U.S. government. There is no cost to use SAM. You can use this site for FREE to: o Register to do business with the U.S. government o Update or renew your entity registration o Check status of an entity registration o Search for entity registration and exclusion records Contractors may obtain information on registration and annual confirmation requirements via the SAM website accessed through https://www.sam.gov/SAM/ or by the Federal Service Desk at 1-866-606-8220. NOTE: On April 4, 2022, the DUNS Number will no longer be used to identify entities doing business with the federal government. It is being replaced by the Unique Entity ID (SAM). The SAM website https://sam.gov/content/duns-uei contains resources to help contractors through the transition from DUNS Number to Unique Entity ID (SAM). On this page, contractors can: o Learn about how this transition affects you, based on the work you do in SAM.gov o Explore general information about the UEI and this change o Get started with requesting a UEI, if you don't have one yet IPP: Payment requests for the anticipated contract must be submitted electronically through the U.S. Department of the Treasury's Invoice Processing Platform (IPP). IPP is a secure, web-based service that more efficiently managements government invoicing from purchase order through payment notification at no charge to federal agencies and their vendors. The IPP website address is https://www.ipp.gov/. The contractor must use the IPP website to register access and use IPP for submitted request for payment. Contractor assistance with enrollment can be obtained by contacting the IPP Customer Support Team via email IPPCustomerSupport@fiscal.treasury.gov or via phone at 1-866-973-3131. If the contractor is unable to comply with the requirements to use IPP for submitting invoices for payment, the contract must submit a waiver request in writing to the Contracting Officer with its proposal. Offerors shall submit questions by March 31, 2023, at 5:00 pm, Mountain Time. Questions submitted after this date and time will not be accepted. Offerors for this RFP, including subcontractors and teammates, shall consolidate questions related to this solicitation and site visit in a Request for Information (RFI) formatted Word document. Any RFI is to be emailed as an editable attachment to Christine Mundt (cmundt@blm.gov) with the subject line: RFI - 140L3623R0002 Copper City Road (GAOA). Only written RFI's will be considered and responded to. BLM responses to the RFI will be posted as an amendment to the solicitation on https://sam.gov/content/opportunities. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents