Similar Projects
Norarrow Multifamily Housing
New Construction, Infrastructure - 270,880 SF
Conception
$80,000,000 CJ est. value
Fort Wayne, IN 46845

Norarrow Multifamily Housing
New Construction, Infrastructure - 270,880 SF
Conception
$80,000,000 CJ est. value
Fort Wayne, IN 46845

Tiburon/Livingston Lakes Extended
New Construction, Infrastructure
Design
Fort Wayne, IN 46818

Hunters Development
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fort Wayne, IN 46845

B764, Weapons Release Addition/Alteration
Addition, Demolition, Renovation, Infrastructure - 20,493 SF
Bidding
$10,000,000 CJ est. value
Fort Wayne, IN 46809

2022 Resurfacing Package Southeast
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Fort Wayne, IN 46802

2022 Resurfacing Package Southeast
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Fort Wayne, IN 46802

Demolition and Lot Restoration for Neighborhood Code
Infrastructure
Results
Fort Wayne, IN

Concrete Pavement Restoration and Replace Superstructure
Infrastructure
Results
IN

RFP Construction Manager - East Terminal Expansion and Renovation
Addition, Demolition, Renovation, Infrastructure
Construction
$7,000,000 CJ est. value
Fort Wayne, IN 46809

Isabelle Gardens
New Construction, Infrastructure
Construction
$5,000,000 CJ est. value
Fort Wayne, IN 46805

RFP Design Architectural and Engineering Services for the Expansion and Renovation of Levan R. Scott Academy
Addition, Renovation, Infrastructure
Pending Verification
$670,000 CJ est. value
Fort Wayne, IN 46806

North River Development
New Construction, Infrastructure
Pending Verification
$150,000,000 CJ est. value
Fort Wayne, IN 46802

Shift or Reconfigure Existing Taxiway - Fort Wayne Allen County Airport Authority
Infrastructure
Conception
$895,148 est. value
Fort Wayne, IN 46825

Small Structure Replacement
New Construction
Design
$4,032,426 est. value
New Haven, IN 46774

Last Updated 07/22/2023 01:03 AM
Project Title

Bridge Deck Overlay - I-69

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN 46808   (Allen County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $2,522,950 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Contract : B -43458-A Project Control No. 2000954, 2000969 Federal/State No. 2000954, 2000969 Bridge Deck Overlay I469-00-07321 Continuous Composite Plate Girder Allen County - on I-69n on-ramp Over I-469, 0.17 Mile East Of I-69 (Rp 000+0017) Bridge Deck Overlay I469-10-07211 Continuous Composite Plate Girder Allen County - on South Anthony Blvd Over I-469, 3.79 Miles East of Sr 1 (Rp 010+0048) Contractors desiring to submit electronic bids via Electronically must register with INDOT as a valid bidder by submitting the form provided on the INDOT Letting Information internet page. Failure to register will cause failure of the Electronic bid submission process. A bidder may request valid bidder status by submitting the bidder registration form until 9:00 AM on the bid opening date. An executed bid bond shall be included with all bids. Only electronic bid bonds submitted through the designated electronic medium, either Surety2000 or Tinubu Surety Solution, will be accepted with the bid. A fully executed performance bond shall be included with all bids, except on contracts for roadside mowing, vegetation control, demolition, landscaping, fencing, seeding and sodding, bridge painting, and guardrail installations of $100,000 or less, when the bidder may elect not to furnish a performance bond. Electronically does not support submittal of the performance bond. The performance bond must be submitted to the Construction Letting email inbox or be delivered on paper by the time set for receipt of proposal bids. Each contractor that submits a proposal bid in the amount of $150,000 or more for highway improvements described in this notice is required to submit with that bid a written plan for a program to test the contractor's employees for drugs. The plan shall be in compliance with Indiana Code 4-13-18. The plan must be submitted to the Construction Letting email inbox or deposited with the INDOT Prequalification Engineer by the time set for receipt of proposal bids. INDOT - Call 661 - Bridge Deck Overlay - I-69 B-43458

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents