Similar Projects
Alpine Academy Middle School
New Construction, Infrastructure - 32,000 SF
Design
$9,000,000 CJ est. value
Chubbuck, ID 83202

RFP Construction Manager - Safe Teen Assessment Center Public Works Construction
New Construction, Infrastructure
Bidding
$4,722,000 CJ est. value
Pauline, ID 83212

I-86, Uprr Bridge, Pocatello
Demolition, New Construction, Infrastructure
Bidding
$15,000,000 CJ est. value
Pocatello, ID 83204

I-86/I-15 Sys IC Reconstruction Pre Advertisement Presentation
Infrastructure
Post-Bid
ID

Re-Constructing the I-15/I-86 System IC
New Construction, Infrastructure
Post-Bid
ID

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

Replacing the Existing Bridges on I-15 at MP 40.425
New Construction, Infrastructure
Results
$5,000,000 to $10,000,000 est. value
ID

Construction of Concrete Curb, Gutter, and Sidewalk
Term Contract
Post-Bid
$500,000 est. value
Inkom, ID

Replace Four Local Bridges
New Construction, Infrastructure
Results
$5,000,000 to $10,000,000 est. value

St. Vincent de Paul Public Facility Improvements
Renovation, Infrastructure
Post-Bid
$100,000 est. value
Pocatello, ID 83201

Moscow North and Moscow Alt Route
Infrastructure
Results

Replace / Install Parking Lot Drains, Idaho State Veterans Home
Infrastructure
Post-Bid
$321,500 est. value
Pocatello, ID 83201

West Fork Mink Creek Trail Bridge 7059-0.3 and 7059-1.5
Renovation
Results
Pocatello, ID

Transmission Line Replacement for 5 MG Tank
Infrastructure
Post-Bid
$710,000 est. value
Pocatello, ID

I-86, US-91, US-30 - Milling and Inlay at Various Locations
Infrastructure
Results
$100,000 to $500,000 est. value

Last Updated 07/29/2022 10:04 AM
Project Title

I-15, Fort Hall Ic #80

Physical Address View project details and contacts
City, State (County) McCammon, ID 83250   (Bannock County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $29,871,191 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Bridge replacements for I-15 Exit #80 (MP 79.9) Overhead Bridge including new ramps, Town Lateral Canal Bridge under I-15 (MP 80.14), and Ross Fork Creek Bridges under the Exit #80 ramps and I-15 (MP 79.8) Please contact the Resident Engineer James Orner P.e. AT (208) 239-3358 for any design related questions. Est: Value Notes: $15,000,000 to $25,000,000 IDOT - I-15, Fort Hall Ic #80 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents