Similar Projects
Old Town Phase 1 Utility Improvements
Infrastructure
Bidding
$2,000,000 est. value
Plainfield, IL

Fifth Street to Ninth Street Roadway and Water Main Improvements
Post-Bid
Lockport, IL

Roadway Reconstruction, Water Main Installation, Storm Sewer Installation, Sidewalk Reconstruction
Post-Bid
Lockport, IL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Forest Park Phase 2 Water Main Improvements
Results
Less than $3,225,000 est. value
Joliet, IL 60432

Vetter Road Segment II Roadway Reconstruction & Realignment Drainage Improvements
Addition
Construction
Joliet, IL

Water Main Improvements
Infrastructure
Post-Bid

Garnsey Park Phase 2 Water Main Improvements
Results
Less than $2,263,890 est. value
Joliet, IL 60435

Water and Sewer Lines
Infrastructure
Post-Bid
Homer Glen, IL

Reedwood Phase 1A Water Main Improvements
Results
Less than $850,000 est. value
Joliet, IL 60436

2022 On-Call Excavation and Underground Utility Repair
Infrastructure
Post-Bid
Joliet, IL

Reedwood Phase 1B Water Main Improvements
Results
Less than $850,000 est. value
Joliet, IL 60436

Well 3 Water Main Reconfiguration
Infrastructure
Post-Bid
$300,000 est. value
Monee, IL

Florence Park Phase 1A Water Main Improvements
Results
Joliet, IL 60433

Bolingbrook Recreation Aquatic Complex Water Valves Replacement
Infrastructure
Post-Bid
$1,070,000 est. value
Bolingbrook, IL 60440

Last Updated 05/11/2022 03:54 PM
Project Title

Gould Street Water Main Replacement

Physical Address View project details and contacts
City, State (County) Beecher, IL 60401   (Will County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Proposed construction consists of replacing approximately 60 lineal feet of 4-inch, 90 lineal feet of 6-inch, 2,970 lineal feet 8-inch and 450 lineal feet of 10-inch diameter water main by horizontal directional drilling and open cut methods including two railroad crossings. The proposed route includes installing new water main along Gould Street, from Indiana Avenue to Miller Street. Construction includes fire hydrants, valves, water service replacements, street and parkway restoration, and other miscellaneous items of work.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents