Similar Projects
Last Updated | 05/11/2022 03:54 PM |
Project Title | Gould Street Water Main Replacement |
Physical Address | View project details and contacts |
City, State (County) | Beecher, IL 60401 (Will County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,100,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Proposed construction consists of replacing approximately 60 lineal feet of 4-inch, 90 lineal feet of 6-inch, 2,970 lineal feet 8-inch and 450 lineal feet of 10-inch diameter water main by horizontal directional drilling and open cut methods including two railroad crossings. The proposed route includes installing new water main along Gould Street, from Indiana Avenue to Miller Street. Construction includes fire hydrants, valves, water service replacements, street and parkway restoration, and other miscellaneous items of work. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |