Similar Projects
Brent Spence Bridge Replacement - Kentucky Department of Transportation
Demolition, New Construction, Infrastructure
Conception
$2,500,000,000 CJ est. value
Covington, KY 41011

PRESS - Imperial Hollow Road Bridge - Bizzack Construction, LLC.
Demolition, New Construction, Infrastructure
Design
Rockholds, KY 40759

Asphalt Paving and Milling
Bidding
Harlan, KY

FEMA Emergency Residential Bridge Repair Projects
Infrastructure
Bidding
$352,626 CJ est. value
Prestonsburg, KY 41653

Production Avenue Extension and Fred Madison Realignment
Post-Bid
Bowling Green, KY

Streetscape
Post-Bid
Georgetown, KY

Bridge Replacement - Miller Road (CR1500) (C00062)
New Construction, Demolition - 720 SF
Results
Elizabethtown, KY 42701

Borax Drive Extension Construction
Results
Henderson, KY 42420

Asphalt Milling and Paving for the District Service Area
Infrastructure
Post-Bid
Erlanger, KY

Highway Avenue Bridge Connection
Results
Covington, KY 41011

2021 Street Paving Season
Infrastructure
Post-Bid
Catlettsburg, KY

Waterborne Paint Striping
Results
Owensboro, KY

Crack Sealant
Infrastructure
Post-Bid
KY

Watch Hill Road Improvements
Results
Fort Mitchell, KY

Asphalt Resurfacing
Infrastructure
Post-Bid
Stanford, KY

Last Updated 12/21/2022 03:13 AM
Project Title

Setser Branch Road Bridge and Approaches over Middle Fork of Rockcastle Creek (C43)

Physical Address View project details and contacts
City, State (County) Inez, KY 41224   (Martin County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $480,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Setser Branch Road Bridge and Approaches over Middle Fork of Rockcastle Creek (C43) (OFF NHS) (FD04) (2000BOP): (080C00043N) Milepoints: From: .03 To: .07 Purpose and Need: Asset Management / AM-Bridge (P) Length .100 As of December 21, 2022, the project is in conceptual status. Anticipated Letting Year is 2024. KYTC - Setser Branch Road Bridge and Approaches over Middle Fork of Rockcastle Creek (C43) *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents