Similar Projects
Woodbury Manor
New Construction
Conception
$4,000,000 est. value
Cantonment, FL 32533

Hammocks Subdivision
New Construction, Infrastructure
Conception
$37,000,000 CJ est. value
Pensacola, FL 32526

Dollar General #24239 / Molino
New Construction, Infrastructure - 10,670 SF
Design
$1,000,000 CJ est. value
Molino, FL 32577

Dollar General #24239 / Molino
New Construction, Infrastructure - 10,670 SF
Design
$1,000,000 CJ est. value
Molino, FL 32577

A Street Revitalization Phase I From Garden Street To Cervantes Street
Infrastructure
Post-Bid
$600,000 CJ est. value
Pensacola, FL 32501

A Street Revitalization Phase I From Garden Street To Cervantes Street
Infrastructure
Post-Bid
$600,000 CJ est. value
Pensacola, FL 32501

Design-Bid-Build Paving Indefinite Delivery Indefinite Quantity Single Award Construction Contract for the Naval Air Station Pensacola Florida Area of Responsibility
Results
$15,000 to $1,000,000 est. value
Pensacola, FL 32508

Muldoon Granular Activated Carbon (GAC) Filter Piping
Infrastructure
Results
$1,281,890 CJ est. value
Pensacola, FL 32501

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

O'Reilly Auto Parts (PN7) #6651 / Pensacola
New Construction, Infrastructure - 7,453 SF
Construction
$500,000 CJ est. value
Pensacola, FL 32506

Moreau Duplexes
New Construction, Infrastructure - 45,700 SF
Pending Verification
$12,500,000 CJ est. value
Pensacola, FL 32506

Moreau Duplexes
New Construction, Infrastructure - 45,700 SF
Pending Verification
$12,500,000 CJ est. value
Pensacola, FL 32506

Isabella Subdivision
New Construction, Infrastructure
Conception
$16,000,000 CJ est. value
Pensacola, FL 32507

Hurricane Sally Repairs for Myrtle Grove Fire Station
Infrastructure
Design
$840,000 CJ est. value
Pensacola, FL 32506

Main Street Hashtag Connector Phase I
Infrastructure
Post-Bid
$2,000,000 est. value
Pensacola, FL 32502

Last Updated 06/26/2023 01:32 PM
Project Title

Dry Creek Subdivision

Physical Address View project details and contacts
City, State (County) Molino, FL 32577   (Escambia County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Paving/Reconstruction, Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $15,200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for a single-family residential subdivision on 37-acres. A more exact scope of work has not been announced including the total square footage of the project. As of June 26, 2023, plans for this project has been approved. A building permit is under review. Information regarding either an architect or general contractor has not been disclosed. A firm construction timeline has not been established.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents