Similar Projects
Reported | 07/27/2020 03:45 PM |
Project Title | Stabilizing Crossing Tubes |
Physical Address | View project details and contacts |
City, State (County) | Charlotte, NC (Mecklenburg County) |
Category(s) | Transportation |
Sub-Category(s) | Railroad/Subway |
Contracting Method | Competitive Bids. |
Project Status | No Responses Submitted, Project to Rebid |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Stabilization of existing railroad crossings. This will involve 4-5 panels at various crossings. Vendor will pump a polyurethane stabilization foam that is specifically designed to fill under the crossing structures without causing lift by filling the void that was created from the tubs pumping. Contractor will drill strategically placed holes into each panel. Using a portable pump and flexible hoses, they will fill these holes with the special mixture (polyurethane foam) Lifting the panel crossing using this method. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |